  • Presentation posted in: General

H2 Layout for EMU. a brief report of a couple of visits by Darin A., Jay R., and FG. H2 Layout. PC#1 plus add’l rack space. more rack space + room for desks. TTCmi/ex. gas pad. beam. H2 beam dump. ME1/1. ME1/1. HCAL. magnet. preferred location of CSCs.

Download Presentation

H2 Layout for EMU

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


H2 layout for emu

H2 Layout for EMU

a brief report of a couple of visits by Darin A., Jay R., and FG


H2 layout

H2 Layout

PC#1 plus

add’l rack space

more rack space

+ room for desks

TTCmi/ex

gas pad

beam

H2 beam dump

ME1/1

ME1/1

HCAL

magnet

preferred location of CSCs

  • Available rack space in Bats. HNA360, 363 and possibly 370 (TTC)

  • Desk space available in Bat. HNA363

  • fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360.

  • Fast and wireless networks available

  • Gas lines and hook-ups available

  • need to add multiple concrete blocks for the CSC constellation

H2 Layout for EMU


Main csc location

cable tray

main CSC location

an artist’s impression …

concrete block

need more of those …

H2 Layout for EMU


Gas hook ups

Gas hook-ups

gas pad

patch panel

  • Available space on the mezzanine gas pad

  • Available (and labeled) gas lines

  • Patch panels in the beam area

H2 Layout for EMU


Open issues

Open Issues

  • ME1/1 location

    • directly behind HCAL

      • quantify punch through, but at higher rates?

      • timing issue?

      • PC location likely to be inside the beam area.

    • in conjunction with the other 3 chambers

      • similar set-up as previous EMU Slice Test

      • compact set-up beneficial for timing

  • TTC setup

    • install 6U crate close to TTCmi (HN370)

      • use fast cables

    • split fiber signal and install TTC crate in HN360

  • Safety requirements regarding the “CSC floor”

    • too many concrete blocks may block access to a search box behind the beam dump