1 / 2

IOOS RFQ Process

IOOS RFQ Process. 2 contracts let to: Develop a conceptual design for IOOS Develop a Life Cycle Cost Estimate Develop a viability narrative Time frame very short – 6 months Lockheed-Martin and Raytheon won the contracts Both reviewed existing documentation and sought external input.

Download Presentation

IOOS RFQ Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IOOS RFQ Process • 2 contracts let to: • Develop a conceptual design for IOOS • Develop a Life Cycle Cost Estimate • Develop a viability narrative • Time frame very short – 6 months • Lockheed-Martin and Raytheon won the contracts • Both reviewed existing documentation and sought external input

  2. IOOS Conceptual Designs Two independent designs, cost estimates and viability narrative were delivered August 31 and September 1, 2006 Participation by an Advisory Team of Federal, Ocean.US and NFRA representatives Both designs: indicate technical viability recommend a service oriented architecture recommend common infrastructure services recommend a program office Next steps include advancing to a preliminary design and implementing initial DMAC infrastructure

More Related