1 / 19

ASHE Presentation

ASHE Presentation. Robert Samour, P.E. Deputy State Engineer Valley Transportation November 8, 2011. Update on ADOT Org. Changes. John Halikowski. Deputy Director for Policy Floyd Roehrich Jr. Deputy Director for Operations John Bogert. Jennifer Toth State Engineer.

taite
Download Presentation

ASHE Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASHE Presentation Robert Samour, P.E. Deputy State Engineer Valley Transportation November 8, 2011

  2. Update on ADOT Org. Changes

  3. John Halikowski

  4. Deputy Director for PolicyFloyd Roehrich Jr.

  5. Deputy Director for OperationsJohn Bogert

  6. Jennifer Toth State Engineer

  7. Valley Transportation Group

  8. Valley Project Management

  9. ADOT Highway Program ● $5.4B

  10. MAG RTP Freeway Program

  11. L303: Peoria to Mountain View, Landscaping, $7M SR51: Bell Rd to L101 FMS, 2M I-17: Arizona Canal - L101 FMS, $5M US60 Grand: L101 to McDowell, Ph 1, $21M L303: Glendale to Peoria & Thomas to Camelback, $189M SR24: Gateway Freeway, L202 to Ellsworth, $148M FY 2012 CONSTRUCTION PROGRAM

  12. I-17: L101-SR74 FMS, $8M L303: Landscape two roadway segments, $6M SR51: Black Mountain Blvd TI, City of Phoenix Project L303: Camelback Rd to Glendale Ave, $56M I-10: Perryville Rd TI, $18M SR85: Warner Street Bridge, $5M US60: Meridian Rd TI, $12M I-10: 32nd St-L202 Loc/Exp Ph 1, $167M FY 2013 CONSTRUCTION PROGRAM

  13. L303: US60 Interim TI, $48M US60: L101 to Van Buren, Ph 2, $21M L303: Camelback to Glendale, Landscape, $2M L101: Shea Blvd to L202, GPL, $91M I-10/L303: TI Landscape, $7M I-10: 32nd St to L202 Loc/Exp Ph 2, $114M L202: 17th Ave to 51st Ave, $228M L202: Dobson to I-10, FMS, $5M FY 2014 CONSTRUCTION PROGRAM

  14. *I-17, Arizona Canal – L101, GPL, $86M *I-17, Peoria – Greenway, Drainage Imp, $17M L202: L101-Gilbert Rd GPL, $56M I-10: Sky Harbor West TI, $37M L202: Baseline to Salt Riv. to Buckeye Rd, $223M I-10: 32nd St to L202, Exp/Loc Ph 3, $135M L202: Salt River Bridge, $99M I-10: L202- Riggs Rd HOV & GPL, $69M L202: Val Vista -Dobson FMS, $6M FY 2015 CONSTRUCTION PROGRAM

  15. FY 2016 CONSTRUCTION PROGRAM ?

  16. I-10: Perryville Rd TI, Design Build US60 Grand Ave/SR303L TI, Interim, CMAR Upcoming Alternative Delivery Projects=================================

  17. I-10: Perryville Road TI, Design-Build US60 Superstition: Meridian Road TI SR101L Pima: Shea Blvd to SR202L, GPL SR303L: US60 Grand Ave TI, CMAR SR303L: Thomas to Camelback & Glendale to Peoria, Landscape MAG Region wide: Four Drainage Tunnels, Drainage Tunnel Improvements MAG RTP Freeway ProgramFY 2012 Design Projects=================================

  18. ADOT – Freeway and Highways Statewide http://mpd.azdot.gov/mpd/priority_Programming/Five_Year_Programs.asp MAG – Freeways, Arterial Streets & Transit http://www.azmag.gov/Projects/Project.asp?CMSID2=1140&MID=Transportation Where to Find Program Information==============================

  19. ASHE Presentation Robert Samour, P.E. Deputy State Engineer Valley Transportation November 8, 2011

More Related