Ecomes
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

EcoMes PowerPoint PPT Presentation


  • 124 Views
  • Uploaded on
  • Presentation posted in: General

2. Products – EcoMarine G1. EcoMes. EcoBlock G1. EcoOTS G1. 3D block accuracy control system Compatible with 3D design model Automatic creating check sheet. PDA based 3D measurement software. Analysis data on site. 3D erection simulation system. Automatic calculating Gap and Overlap

Download Presentation

EcoMes

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ecomes

2. Products – EcoMarine G1

EcoMes

EcoBlock G1

EcoOTS G1

  • 3D block accuracy control system

  • Compatible with 3D design model

  • Automatic creating check sheet

  • PDA based 3D measurement software.

  • Analysis data on site.

  • 3D erection simulation system.

  • Automatic calculating Gap and Overlap

  • BlockInsert erection simulation


Ecomes

3. Expected effects after the

introduction of EcoMarine.


Ecomes

Case Study – Chinese Shipyard

  • 1. The year of introduction EcoMarine to the Shipyard :2008

  • 2. Condition of the Shipyard

  • Location: China

  • Main products : 172K, 176K BC, VLCC, FPSO,

  • Semi Rig..

  • - Facilities

  • Dock 480*106   Crane 600T*2

  • Dock 540*76      Crane 600T*1, 800T*1

  • CAD system : Tribon M3


Ecomes

Case Study – Chinese Shipyard

3. Detail of Changes after adopting 3D Accuracy Control System


Ecomes

Case Study – Chinese Shipyard

4. Changes of block acceptance rate (Checking completed block in Erection dept)

5. Changes of purchase EcoMarine


Ecomes

Effects

  • More safety.

  • Assembly more accurate block.

  • Shortening of construction time.

  • Prevent rework.

  • AchieveOne Time Setting for the erection.

  • 1~2 additional ships are able to be built per one dock(or birth)

  • Produce high skilled technician.

  • - Acquire advanced technology.


Ecomes

Thank you.


  • Login