Fracturas en pozos no convencionales. Presenter’s Name. Date. Experiencias en fracturas no convencionales. 1,200,000 HHP 2011: aprox.10,000 fracturas. Pozo Tipo - EEUU. Plug & Perf. Etapas Fractura: 16 Distancia e/tapones (mts): 111

Download Presentation

Fracturas en pozos no convencionales

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Fracturas en pozos no convencionales

Fracturas en pozos no convencionales

Presenter’s Name

Date


Fracturas en pozos no convencionales

Experiencias en fracturas no convencionales

  • 1,200,000 HHP

  • 2011: aprox.10,000 fracturas


Pozo tipo eeuu

Pozo Tipo - EEUU


Plug perf

Plug & Perf

Etapas Fractura: 16

Distancia e/tapones (mts): 111

Clusters por etapa: 8

Distancia e/clusters (mts): 12

Total de Fracturas: 128


Plug perf esquema de disparos

Plug & perf- Esquema de disparos


Plug perf secuencia de operaciones

Plug & Perf – Secuencia de operaciones

  • Calibrar y punzar 1era etapa con CT

  • Desmontar CT, montar set de fracturas y WL

  • Fracturar 1era Etapa

  • Pump Down WL con Frac plug y cañones

  • Sacar WL, cerrar válvula superior

  • Bombear top ball y fracturar 2da etapa

  • Plug & Perf etapas subsiguientes

  • Desmantelar set de fracturas, instalar CT

  • Moler tapones y producir pozo

  • Promedio: 4 etapas por día


Multizone stimulation technologies jitp

Multizone Stimulation Technologies - JITP


Multizone stimulation technologies act frac

Multizone Stimulation Technologies – ACT Frac


Sistemas de multi fracturas open hole

Sistemas de multi-fracturas Open Hole

Zone Select


Zoneselect tm multi zone completion system

ZoneSelectTM– Multi-zone completion system


Tapones de material compuesto

Tapones de material compuesto


Composite plugs

Composite Plugs

Composite Pump Down Plugs

13


Dise o fractura slickwater

Diseño Fractura – Slickwater


Gr fica fractura slickwater

Gráfica Fractura – Slickwater


Dise o fractura hibrida x linked eagleford

Diseño Fractura – Hibrida X-linked EagleFord


Gr fica fractura hibrida x linked eagleford

Gráfica Fractura – hibrida X-linked EagleFord


Tendencias

Tendencias

  • Laterales mas largos

    • Equipamiento (presiones, HHP, CT, wireline, tapones, etc…)

    • Mayor cantidad de fracturas

  • Espaciamiento de clusters según perfiles (sweet spots)

  • Mejor divergencia (menos clusters y mas etapas de fractura)

  • Mayor conductividad, geles croslinkeados


Lay out plug perf i 40 000 hhp

Lay out Plug & perf – I (40.000 HHP)


Lay out plug perf ii 56 000 hhp

Lay Out Plug & perf – II (56,000 HHP)


Lay out plug perf iii 2 x 16 000 hhp

Lay Out Plug & perf – III (2 x 16,000 HHP)


Lay out plug perf iv locaci n seca

Lay out Plug & perf – IV (Locación seca)


Fracturas en argentina

Fracturas en Argentina

  • Lajas, Molles

    • Fernandez Oro / Centenario

    • Caudales de 40 a 50 bpm

    • Bajas cargas poliméricas (hasta 18 lbs/1000 gal)

    • Promedio 1500 sks

    • Fracturas híbridas con gel lineal – gel activado

    • Pozos verticales, tapones composite

    • Una etapa cada 14 horas


Tratamiento de fractura lajas

Tratamiento de fractura Lajas


Carta bombeo fractura lajas

Carta bombeo fractura Lajas


Fracturas en vaca muerta

Fracturas en Vaca Muerta

  • Plaza Huincul, pozos someros

  • Fracturas híbridas con slick water – gel activado

  • Hasta 60 BPM

  • Pozos verticales


Dise o de fractura vaca muerta

Diseño de fractura Vaca Muerta


Carta de bombeo vaca muerta

Carta de bombeo Vaca Muerta


Equipos de fracturas en argentina

Equipos de fracturas en Argentina

  • Equipos en Argentina

    • seis bombas (12,000 hhp)

    • dos blenders (100 y 40 bpm), dos unidades de hidratación, dos sand feeders, tres sand dumpers, dos data vans, dos manifolds, doce piletas, otros..


Equipos de fracturas en argentina1

Equipos de fracturas en Argentina

  • Equipamiento en frontera

    • siete bombas (14,000 hhp), un blender (100 bpm), una data van, un sand feeder

    • un set de CT incluyendo bomba y nitrógeno


Equipos de fracturas en argentina2

Equipos de fracturas en Argentina

  • Equipamiento en construcción

    • 10,000 hhp, un manifold, una unidad de hidratación, una unidad dosificadora químicos C10

    • segundo set de CT