Informal document No
This presentation is the property of its rightful owner.
Sponsored Links
1 / 2

Overall Japan image of Flex-PLI Introduction into gtr as well as ECE PowerPoint PPT Presentation


  • 55 Views
  • Uploaded on
  • Presentation posted in: General

Informal document No . GRSP-48-23 (48th GRSP, 7 - 10 December 2010, agenda item 4). [adequate lead time]. gtr amendments 02 Flex only; TBD after US finish Flex durability tests to US vehicles. adequate lead time settled by each CP. ECE 00 series. gtr.

Download Presentation

Overall Japan image of Flex-PLI Introduction into gtr as well as ECE

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Overall japan image of flex pli introduction into gtr as well as ece

Informal document No.GRSP-48-23

(48th GRSP, 7 - 10 December 2010,

agenda item 4)

[adequate lead time]

gtr amendments 02

Flex only; TBD after US finish Flex durability tests to US vehicles

adequate lead time

settled by each CP

ECE 00 series

gtr

Effective date of gtr amendments 01

Effective date of gtr amendments 02

Adequate lead time for gtr amendments 01 (settled by each CP)

ECE

Entry into Force Date of ECE 01 series amendments

End of Transitional period of ECE 01 series amendments

Transitional period; [84] months after the Date of Entry into Force of ECE 01 series amendments

Transmitted by the expert from Japan

Overall Japan image of Flex-PLI Introduction into gtr as well as ECE

  • Japan would like to appreciate to share following introduction schedule with CPs as well as OICA

current gtr

gtr amendments 01

Flex* or EEVC; CPs choice

End of transitional period

ECE 01 series amendments

<Transitional period: [84] months or [until 2017**]>

Flex* or EEVC: Manufactures choice

ECE 01 series amendments

<After Transitional period>

Flex only

* EEVC Shearing Displacement requirement is possible to use alternatively of Flex ACL/PCL requirement

** One of an idea to set transitional period using a year


Overall japan image of flex pli introduction into gtr as well as ece

Comparison Table of gtr 9 Amendments 01 (GRSP-2010-37)

and ECE 01 Series Amendments (GRSP-48-09)<Updated Japan Proposals>


  • Login