Preliminary Design Review Week 10

Preliminary Design Review Week 10. THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 27, 2008. Previous Week’s Action Items. Order All Necessary Parts McMaster-Carr Complete Machining of Platform Base and Fit to Chassis

suzuki
Download Presentation

Preliminary Design Review Week 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preliminary Design ReviewWeek 10 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 27, 2008

  2. Previous Week’s Action Items • Order All Necessary Parts • McMaster-Carr • Complete Machining of Platform Base and Fit to Chassis • Continue Working on Program • Interfacing with Peripheral Equipment • Search Algorithm

  3. Previous Week Action Items and Status CURRENT STATUS: Slightly Behind Schedule, No Serious Showstoppers

  4. Reasons for Delay • Expected to Receive GPS from Mr. Brownell • Parts delay: • Due to redesign • Platform: • Have platform with grooves • Need to drill holes and fit to chassis • Will be done by today

  5. Close Up of the Final Prototype Design

  6. Close-Up of CAD Features

  7. Close-Up of CAD Features

  8. Acquired Parts • 12” x 24” x 3/8” Gray PVC • 12” x 24” x 3/16” Clear PVC • 15 lb/in Springs • 57 lb-oz Servo Motor • Digital Compass • Bumper – Maximum deflection of 0.000406”

  9. Ordered Parts • 6” Long 3/16” Dia. Precision Ground Rod • 6 Brass Bushings • C-Clips • L-Brackets • 2 Hinges To be acquired from local stores: • 4 Colored Light Bulbs • 4 Light Bulb Mounts • Set Screws

  10. Vehicle Interfacing • Utilized keypad to interface with chassis • Cued search algorithm steps with keypad • Interfaced with LCD • Need math.h file for certain math operations • Trigonometry • Square roots • Etc.

  11. Next Week’s Action Items • Complete Machining of Enclosure Walls and Top • Obtain and Test GPS from Mr. Brownell • Continue Working on Program • Search algorithm and field work • Interface with GPS

  12. QUESTIONS?