1 / 2

Stave-1 loading status

Didier, Nov 17 th 2011. Stave-1 loading status. Wire bonding cradle made by Uni Bern finally arrived and has been installed on the H&K machine. It is perfectly interfacing the stave handling frame

susane
Download Presentation

Stave-1 loading status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Didier, Nov 17th 2011 Stave-1 loading status • Wire bonding cradle made by Uni Bern finally arrived and has been installed on the H&K machine. It is perfectly interfacing the stave handling frame • Wire bonding tests wad done on baby detector mounted on the stave in 6 different configurations: • No support - 1 bonding phase: Failing bonds • No support - 2 bonding phases: Good bonds – Pull test: 15.4g in av. • Foam support just below – Pull test: 16.4g in av. • Foam support at each side (~70mm) – Pull test: 17.1g in av. • “V” feet support below – Pull test: 14.3g in av. • “V” feet support at each side (~70mm) – Pull test: 15.7g in av. • Last module (other bond pad layout) received from Genovaon Nov 15th and tested by Yosuke BUT • - Module is not working at the FE-R while it was working fine at Genova • - It has been identified region of destroyed wire bonds (possibly destroyed during transport) • - Under rework at UniGeand then retest… • Wing adhesive investigations – Try to avoid sticky tape and instead using a re-workable glue join. Several glued identified and which will have to be thermal cycled and tested with the ionizing radiations (later investigations) • Basic tooling for module pigtail cutting is under fab • Alignment rule for module loading has to be modified: pigtail excess length vs detector edge • The damaged pipe side has to be cut with a Dremel (under investigation now) • Next steps: • Loading • Wing gluing • Wire bonding • Strain relieve of the pipe to be added • Pipe fitting to be worked out by CPPM and LAPP • Stave ready to be transport at SR1 Best results

  2. Wire bonding cradle mounted on the bonding machine Stave-1 - Illustrations Wire bonding tests “V” foot Foam foot Module – Pigtail flavor for Genova flex Wire bond region with visible damages – under rework

More Related