1 / 16

IAEA Technical Working Group on Nuclear Power Plants Control and Instrumentation

IAEA - TWG NPPCI meeting NA-SA Nucleoel

susan
Download Presentation

IAEA Technical Working Group on Nuclear Power Plants Control and Instrumentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. IAEA - TWG NPPCI meeting NA-SA Nucleoeléctrica Argentina Sociedad Anónima 1 IAEA – Technical Working Group on Nuclear Power Plants Control and Instrumentation Vienna, AUSTRIA 23 to 25 May 2005 Mario Oscar Sabransky I&C and Electrical Maintenance Atucha 1 NPP Nucleoeléctrica Argentina Sociedad Anónima

    2. IAEA - TWG NPPCI meeting NA-SA Nucleoeléctrica Argentina Sociedad Anónima 2 Status of the Instrumentation & Control in the Argentine Nuclear Power Plants INTRODUCTION 1974 – Atucha 1 NPP (CNA1) began commercial operation. 1984 – Embalse NPP (CNE) began commercial operation. 1980 – Atucha 2 NPP (CNA2) started construction. 1994 – NA-SA become operator of the in service NPPs and responsible for the management of human resources, equipments and installations of the temporarily stopped CNA2.

    3. IAEA - TWG NPPCI meeting NA-SA Nucleoeléctrica Argentina Sociedad Anónima 3 Status of the Instrumentation & Control in the Argentine Nuclear Power Plants

More Related