Component environmental test chamber
Download
1 / 31

Component Environmental Test Chamber - PowerPoint PPT Presentation


  • 60 Views
  • Uploaded on

Component Environmental Test Chamber. Team Members Advisors Peter Adam Thong Vo Dr. Robert Daasch - PSU Jeff Hughes Phong Ngo Justin Riel - DTNA. OVERVIEW. Problem Statement Proposal and Solution Electrical Design Mechanical Design Last Minute Changes Conclusion Questions.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Component Environmental Test Chamber' - susan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Component environmental test chamber

Component Environmental Test Chamber

Team MembersAdvisors

Peter Adam Thong Vo Dr. Robert Daasch - PSU

Jeff Hughes Phong Ngo Justin Riel - DTNA

May 21st, 2012


Overview
OVERVIEW

  • Problem Statement

  • Proposal and Solution

  • Electrical Design

  • Mechanical Design

  • Last Minute Changes

  • Conclusion

  • Questions


Problem statement
Problem statement

Department


Present situation
PRESENT SITUATION

  • Daimler Trucks Product Validation Engineering (PVE) tests components to ensure they meet minimum specifications.

    • More specifically, Mechatronics PVE tests the electrical components in trucks.

  • Some electrical components are attached under the hood, and other areas where they may be exposed to the outside environment.

    • In some cases, this may include exposure to water, especially in vocational models built for heavy duty applications.

Biggest D.U.T.


Problems
PROBLEMS

Current electrical component testing is done in the following method;

While this may ‘get the job done’, there are a few concerns;

There is no pre-determined pressure or exposure time (no standard).

Repeatability is almost impossible.



Dtna proposal
DTNA PROPOSAL

  • In an attempt to set a testing standard, Daimler Trucks Germany provided their testing specifications.

    • This document highlights E.U. standards for testing of electrical components at varying levels of intensity.

  • Three water spraying tests to be conducted:

    • 4K – Low pressure (~60 PSI), Low flow (~0.15 GPM per hole), Room Temperature

    • 6K – Medium pressure (~145 PSI), High flow (~20 GPM), Room Temperature

    • 9K – High Pressure (~1300 PSI), Medium flow (~4.0GMP), High Temperature (~180 ⁰F)

  • 9K Test

    6K Nozzle

    4K Test


    Dtna proposal cont
    DTNA PROPOSAL (cont.)

    • Currently, there is no company in the United Stated that specializes in equipment which conducts all the required tests.

    • DTNA first contacted suppliers to estimate the cost of building a device to perform these three tests.

      • Supplier Estimate = $40,000

      • Daimler thought this was not a competitive estimate.

  • Solution: Joint ECE-ME capstone project with a $10,000 budget.

    • Due to the unique nature of this task, both ECE and ME students were recruited.


  • Ece me joint solution
    ECE-ME JOINT SOLUTION

    • As our capstone proposal, we created a testing chamber for DTNA

      • The chamber can run all three tests (4/6/9K).

      • Will come around $10,000 budget.

      • Almost fully automated.

      • PLC as the controller

      • Touchscreen for the G.U.I

      • 2 Separate pumps and water reservoirs.

      • Steel Frame.


    Electrical design
    Electrical Design

    Department




    Gui touchscreen
    GUI - TOUCHSCREEN

    • EZTouch Enhanced 6’’

    • Directly Read/Write to PLC memory

    • Multiples pages for different control, monitor situations

    • Animation for operator

    • Update status of the system

    • Message, alarms

    Department


    Sensor suite
    SENSOR SUITE

    • Thermocouple: to ensure that 9K test is at appropriate temperature

    • Water leak sensors.

    • Door lock

    • Pressure switch

    • Float level switch


    Turntable
    TURNTABLE

    • Stepper motor (2 – 5 RPM)

    • Stepper driver

    • Double gear turntable


    Power devices
    POWER DEVICES

    • Pumps

    • Heater

    • Stepper motor

    • Solenoid Valve


    Controller plc
    CONTROLLER - PLC

    • Automation Direct DL06

    • Discrete I/O, 0-24V

    • 20 Inputs/16 Outputs

    • Thermocouple external card

    • Program by Ladder logic

    • Support by John 

    Department



    Mechanical design
    Mechanical Design

    Department


    Final design test chamber
    FINAL DESIGN - TEST CHAMBER

    • The test chamber consists of a large conical inductor tank.

      • Provides an easy solution for draining and recirculating water.

      • Plans to create a clear acrylic door for the chamber.

      • Will contain nozzles and turntable inside.


    Final design nozzles
    FINAL DESIGN - NOZZLES

    • 4K nozzle:

      • Will be bent out of aluminum pipe stock at Daimler.

  • 6K nozzle:

    • Will be machined in-house out of aluminum then welded together

    • Slight dimension changes from DT Germany specifications to simplify manufacturing.

  • 9K nozzle:

    • Will be bought from supplier and modified to comply to spray geometry specifications from DT Germany.


  • Final design pump systems cont
    FINAL DESIGN - PUMP SYSTEMS (cont.)

    • To use the pump for both the 4K and 6K test, a few steps had to be taken:

      • A manifold had to be created for the pump system.

      • A pressure regulator will enable the pump to operate at both the 4K and 6K specifications.


    Final design pump systems cont1
    FINAL DESIGN - PUMP SYSTEMS (cont.)

    • 9K Pump system:

      • Due to time and manpower constraints, pump was ordered from a DTNA supplier.

      • Hotsy Model 1700 pump, bought from American Equipment co.

      • Made specifically for high pressure and high temp. applications, with after-market hot seals

      • Water supplied from heated Galvanized Steel Tank

      • Single Phase


    Last minute change
    Last minute change

    Department


    Last minute changes
    LAST MINUTE CHANGES

    • Initially, we explored two solenoid valves to control the draining from the test chamber.

      • We found that the flow through the solenoid valves was not sufficient for the 6k test. We then investigated a larger actuated 3-way ball valve which was found to be cost prohibitive.

      • The solution we settled on was a manually operated 3-way ball valve to reduce costs. The valve has mounting for an actuator.

  • For the 9K tests, high pressure and high temperature solenoid valves were specified for use.

    • We proposed that the operator move the position of the nozzle manually, rather than use 4 different solenoid valves to do this automatically.

    • DTNA accepted this proposal, and it removed over $1000 of cost from the apparatus.


  • Conclusion
    conclusion

    Department



    Questions
    QUESTIONS

    • Questions?

    • Comments?

    • Concerns?


    Backup slides
    Backup slides

    Department


    Current problem
    Current problem

    • 9K test need more for 4 nozzle

    • Need a drainer for 6K and 9K test

    Department


    More to add
    More to add

    Department