Vasily dzhordzhadze monopole group meeting bnl july 26 2007
This presentation is the property of its rightful owner.
Sponsored Links
1 / 27

Run7 Monopole Test Experiment (Summary) PowerPoint PPT Presentation


  • 44 Views
  • Uploaded on
  • Presentation posted in: General

Vasily Dzhordzhadze Monopole Group Meeting, BNL July 26, 2007. Run7 Monopole Test Experiment (Summary). Outline. Introduction Run7 – Monopole Test Experiment Results Future experiments (Run8 and Run 9) Summary. September 2006 PAC Recommendations. Motivation

Download Presentation

Run7 Monopole Test Experiment (Summary)

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Vasily dzhordzhadze monopole group meeting bnl july 26 2007

Vasily Dzhordzhadze

Monopole Group Meeting, BNL

July 26, 2007

Run7 Monopole Test Experiment (Summary)


Outline

Outline

  • Introduction

  • Run7 – Monopole Test Experiment

  • Results

  • Future experiments (Run8 and Run 9)

  • Summary


September 2006 pac recommendations

September 2006 PAC Recommendations

  • Motivation

    The observation of a magnetic monopole would be a profound discovery in physics. However, it is very important to compare the goals of the proposed experiment with what has already been achieved in earlier experiments, for example at FNAL, in a more complete fashion than in the present proposal.

  • Experiment

    Since there is little experience with the operation of a SQUID detector in the environment of a RHIC experiment, some experimental tests would be extremely valuable and should be carried out by the proponents. The results could well lead to modifications of the experimental design or to reevaluations of the sensitivity of the search.

http://www.bnl.gov/npp/docs/pac0906/chaudhari_Monopole-RHICPAC.pdf


Run7 monopole test experiment summary

Drell-Yan Predictions at RHIC and LHC

4


Run7 monopole test experiment summary

Expected Cross sections at RHIC and LHC

5


Run7 monopole test experiment summary

Published MM Experimental data

6


Relativistic heavy ion collider

Relativistic Heavy Ion Collider


Run7 monopole test experiment summary

RHIC Performance in Run7

8


Run7 monopole test experiment summary

RHIC Weekly Integrated Luminosities

9


Run7 monopole test experiment summary

RHIC Integrated Luminosities

10


Run7 monopole test experiment summary

BNL and SBU Dewars at the BRAHMS Intersection Area

SBU

BNL

IR2

BEAM PIPE

11


Run7 monopole test experiment summary

Dewar Filling at the BRAHMS Area

12


Run7 monopole test experiment summary

BRAHMS (IR2) Area

BNL

SBU

13


Run7 monopole test experiment summary

14


Run7 monopole test experiment summary

Chipmunk at the IR2 Area

15


Run7 monopole test experiment summary

SBU SQUID Noise response

16


Run7 monopole test experiment summary

SBU SQUID Noise response

17


Run7 monopole test experiment summary

BNL Gradiometer-SQUID Response

Noise spectrum: beam on and off

18


Run7 monopole test experiment summary

BNL SQUIDs Response vs BRAHMS ZDC Counts

19


Run7 monopole test experiment summary

BNL Gradiometers-SQUIDs Response

20


Run7 monopole test experiment summary

BNL Gradiometers-SQUIDs Response

21


Run7 monopole test experiment summary

BNL Gradiometers-SQUIDs Response

22


Run7 monopole test experiment summary

SQUIDs Response on Injected pseudopole

23


Run7 monopole test experiment summary

BNL Gradiometers-SQUIDs Response

24


Run7 monopole test experiment summary

BNL Gradiometers-SQUIDs Response

25


Future rhic runs 8 and 9

Future RHIC Runs (8 and 9)

Years 2007-2008 2008-2009

d-Au Au-Au

Peak L 40 40

s(95%) = 3/(eLdt) = 5.5 x 10-32


Summary

Summary

  • Test Run was successful

  • SQUIDs and Gradiometers behavior is independent from RHIC beam

  • Devices picking up noises from RHIC

  • Perfect Shielding needs to be designed

  • What will be noise when we open the pipe and how to protect devices?

  • Looking forward for DoE approval