Vasily dzhordzhadze monopole group meeting bnl july 26 2007
Download
1 / 27

Run7 Monopole Test Experiment (Summary) - PowerPoint PPT Presentation


  • 71 Views
  • Uploaded on

Vasily Dzhordzhadze Monopole Group Meeting, BNL July 26, 2007. Run7 Monopole Test Experiment (Summary). Outline. Introduction Run7 – Monopole Test Experiment Results Future experiments (Run8 and Run 9) Summary. September 2006 PAC Recommendations. Motivation

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Run7 Monopole Test Experiment (Summary)' - sumi


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Vasily dzhordzhadze monopole group meeting bnl july 26 2007

Vasily Dzhordzhadze

Monopole Group Meeting, BNL

July 26, 2007

Run7 Monopole Test Experiment (Summary)


Outline
Outline

  • Introduction

  • Run7 – Monopole Test Experiment

  • Results

  • Future experiments (Run8 and Run 9)

  • Summary


September 2006 pac recommendations
September 2006 PAC Recommendations

  • Motivation

    The observation of a magnetic monopole would be a profound discovery in physics. However, it is very important to compare the goals of the proposed experiment with what has already been achieved in earlier experiments, for example at FNAL, in a more complete fashion than in the present proposal.

  • Experiment

    Since there is little experience with the operation of a SQUID detector in the environment of a RHIC experiment, some experimental tests would be extremely valuable and should be carried out by the proponents. The results could well lead to modifications of the experimental design or to reevaluations of the sensitivity of the search.

http://www.bnl.gov/npp/docs/pac0906/chaudhari_Monopole-RHICPAC.pdf











BRAHMS (IR2) Area

BNL

SBU

13






BNL Gradiometer-SQUID Response

Noise spectrum: beam on and off

18









Future rhic runs 8 and 9
Future RHIC Runs (8 and 9)

Years 2007-2008 2008-2009

d-Au Au-Au

Peak L 40 40

s(95%) = 3/(eLdt) = 5.5 x 10-32


Summary
Summary

  • Test Run was successful

  • SQUIDs and Gradiometers behavior is independent from RHIC beam

  • Devices picking up noises from RHIC

  • Perfect Shielding needs to be designed

  • What will be noise when we open the pipe and how to protect devices?

  • Looking forward for DoE approval