Engineering & Construction Management Department. May Report, 2011. Gran Cima Street & Drainage Improvements.

Download Presentation

Page 1 of 1

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Page 1 of 1

Engineering & Construction Management Department

May Report, 2011

Gran Cima Street & Drainage Improvements

General Project Description: Project located on Gran Cima between Ashwood and Cumbre Negra. Project consist of wedge milling existing asphalt and resurfacing street, installation of 2 drop inlets , ADA driveways, street signage and street lights.

PROJECT SCHEDULE

Design Status: Design Complete

Pending Issues: Bid Opening

Overall Project Budget (includes approved project development, design and construction costs): $232,170.00

Funding Source(s): CDBG 36th Year

Project Contact

Project Manager:Ziad Al-Dasouqi

541-4200

Design Consultant:In-House Design