Sb summary
Download
1 / 22

SB Summary - PowerPoint PPT Presentation


  • 59 Views
  • Uploaded on

SB Summary. 4 March 2008. Update. 9 stacks have been installed. One more was tested which shows lower gain has not yet been installed. The scintillation cube has been evaporated onto. The trip recovery procedure was altered to increase wait time before ramp up.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' SB Summary' - sophia-parsons


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Sb summary

SB Summary

4 March 2008


Update
Update

  • 9 stacks have been installed.

    • One more was tested which shows lower gain has not yet been installed.

  • The scintillation cube has been evaporated onto.

  • The trip recovery procedure was altered to increase wait time before ramp up.

  • The GEMs from the east have been washed.

  • Drift field studies are in progress.


Gem failures
GEM Failures

  • Last week we presented the hypothesis that the increase in GEM failures inside the test box was due to the old feed-through to power the light cube.

  • This has been confirmed.

  • Not just luck.


Do we understand the gain
Do We Understand The Gain?

  • We’ve become accustomed to gains > 20,000 with CsI and > 10,000 without at dV = 511

  • We got worried about WN4 with a post-CsI gain of <9000 and now we’ve tested a stack with gain of 11,000 (not installed yet)

  • Is water the mystery variable?

  • Is there an evaporation dependence to the post-CsI gain increase?



What s next
What’s Next?

  • We plan to complete instrumentation of the HBD west soon. A possible plan:

  • Power each module and make sure it holds voltage

  • Heat the glove box in an effort to remove water.

  • Close the vessel and use Bob’s gas system, to gauge the water content in N.

  • When we’ve reached an acceptable water level use Bob’s or the LEGS gas system to flow CF4 and power the whole detector for a long test (maybe only 7/10 at a time depending on the availability of HV feed-throughs).

  • HV from LeCroy - we need more modules!







8107

Installed in WN4


8108

Installed in WN4



8110

Not installed





8114

Installed in WS1


8115

Installed in WS2


8116

Installed in WS5