1 / 15

RTF Subcommittee Meeting

RTF Technical Support Needs for Small & Rural Utilities October 27, 2010. RTF Subcommittee Meeting . Agenda. Introductions Review revised project timeline Analysis methodology Analysis findings Next steps Q&A. Revised Project Timeline. Interim Analysis Methodology.

sonora
Download Presentation

RTF Subcommittee Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTF Technical Support Needs for Small & Rural Utilities October 27, 2010 RTF Subcommittee Meeting

  2. Agenda • Introductions • Review revised project timeline • Analysis methodology • Analysis findings • Next steps • Q&A

  3. Revised Project Timeline

  4. Interim Analysis Methodology • Characterize utilities • Clean/prune data (remove misc. “non-utility” entities) • Small (<15 aMW) • Rural (LDD recipients) • Residential (> 60%) • Use 2007-2010 PTR dataset as base • C&RD to be available for next round • PNGC and IDEA pools to be broken out in next round • Develop measure bins based on PTR categories • Develop high-level summaries of measure implementation behavior

  5. Analysis Categories • Renewables • Measure Bins • Commercial Envelope • Commercial Equipment • Commercial Lighting • Commercial Third Party • Residential Appliances • Residential Envelope • Residential HVAC • Residential Water Heating • Low Income Weatherization • Agricultural • Industrial • Utility Systems • Traffic Signals

  6. Utility Breakdowns • Small = 41 • Rural = 36 • Small or rural = 77 • Small/rural = 13 • Residential = 36 • Small/residential = 12 • Rural/residential = 16 • Small/rural/residential = 6

  7. Potential Utility Selection Criteria • Utility characterization breakdowns • Volume of savings • Patterns of measure implementation of various utilities • Residential vs. commercial • Renewables vs. measures • Climate

  8. Distribution of Utilities by Load & Customer Base (All Utilities)

  9. Overall Distribution of Measures (All Utilities)

  10. Overall Distribution of Measures, Not Renewables (All Utilities)

  11. Distribution of Measures by Small/Rural

  12. Distribution of Measures vs. Renewables by Small/Rural Utilities

  13. Next Steps • Incorporate C&RD and individual utilities from PNGC and IDEA • Perform analysis on complete dataset • Take a closer look at individual measures, normalize across utilities for comparative analysis • Refine utility selection criteria • Develop list of recommended utilities • Develop draft survey questions

  14. Questions & Answers

  15. Ecotope Contact: Poppy Storm, Project Manager 4056 9th Avenue NE − Seattle, Washington, 98105 PH: (206) 322-3753, FAX: (206) 325-7270 www.ecotope.com

More Related