An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC project status Muon IB 28 February 2012 Pigi Paolucci INFN Napoli & CERN

  2. 2012 Detector start-up RPC system is ON since a week, how it is working ? Muon IB - Pigi Paolucci

  3. Hardware status • At the moment we have 11 Chambers OFF, same number of 2011 • One new single gap chamber in the barrel. • 3.5% of dead and masked channels Muon IB - Pigi Paolucci

  4. Muon IB - Pigi Paolucci

  5. Current stability during MWGR Muon IB - Pigi Paolucci

  6. Noise results from MWGR • Run 185984 (last night, long run): ~1.0% masked channels, ~1.3% dead channels • 18 chambers off (5 in the barrel, 13 in the endcap) • Average noise ~3 Hz/cm2 (barrel), ~0.3 Hz/cm2 (endcap) Muon IB - Pigi Paolucci

  7. Few noisy strips in Barrel region Muon IB - Pigi Paolucci

  8. Noisy strips from DQM ? YES is possible Run 185 984 All hits Plots ENDCAP BARREL from 2 to 25  noise Muon IB - Pigi Paolucci

  9. BARREL Run 185 984 Similar in the 5 wheels Bottom trigger Noisy strips/chamber from DQM tool Muon IB - Pigi Paolucci

  10. Trigger correlation Muon IB - Pigi Paolucci

  11. 2012 – Open Issues and organization • Deputy DPG • Karol confirmed, Silvia Costantini (Ghent) new • PVT group • Marcello Abbrescia is the new coordinator • Task force • Efficiency method validation • HV scan • Bakelite production • Gas leak studies Muon IB - Pigi Paolucci

  12. Upgrade Summary Report • First batch of Bakelite sheets, produced and tested in Pavia, washed at General Tecnica, is now in Korea • Most of the sheets show a dirty surface and cannot be used to produce gaps – Second batch will be followed step by step by our experts (March) • 3 Test sites are almost ready • New link and control boards have been successfully tested at 904 and installed in the Barrel – We will keep them running • Database work is proceeding very well, thanks to Anton, Daniela and new Pakistan experts. Muon IB - Pigi Paolucci

  13. 2011 Summary table • Data Loss for RPC 19 pb‐1 – 0.37% • Overall Operating Channels 98.4% • Average Efficiency 95% • Average Cluster Size < 2 • Average Noise rate (3 ·1033 cm-2 s-1)1.3 Hz/cm2 • Max Noise rate (3 ·1033 cm-2 s-1)RE-2/2/C < 7 Hz/cm2 • Average intrinsic noise (no-beam) ~ 0.1 Hz/cm2 • Average current (no-beam) ~ 1 mA • Average current (with beam) ~ 1.5 mA • Temperature < 21.5 oC Muon IB - Pigi Paolucci

  14. 2012 goals and milestones (no news) • New efficiency method; test and then in DQM • 2012 HV scan and comparison with 2011 • Background studies at high luminosity (1-5 1033) • Background summary results in WBM • Automatic PVT • Long 2013-2104 shut-down plan definition (July 2012) • Gaps and chambers production • 904 cosmic stand and laboratory start-up  • Link and Control board preproduction and test (Feb)  Muon IB - Pigi Paolucci

  15. Dates to remember • Muon Week – 18-21 March – CERN • Bakelite production validation – March • HV scan – April • Long Shut-down workshop – June Muon IB - Pigi Paolucci