1 / 6

A flash-ADC for each strip with digital storage Replace electronics on Highest Rate Chambers

SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group. A flash-ADC for each strip with digital storage Replace electronics on Highest Rate Chambers Deadtimeless. ME1/1 Electronics Upgrade 504 DCFEBs OSU 72 DMBs NE,UCSB 72 TMB (d.c.) TAMU,UCLA

sonel
Download Presentation

A flash-ADC for each strip with digital storage Replace electronics on Highest Rate Chambers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group • A flash-ADC for each strip with digital storage • Replace electronics on Highest Rate Chambers • Deadtimeless ME1/1 Electronics Upgrade 504 DCFEBs OSU 72 DMBs NE,UCSB 72 TMB (d.c.) TAMU,UCLA 8 MPC Rice 72 LVDB (+more power) 72 LVMB 1008 Cables (default skewclear) 1st prototype Nov 2010 Analog-digital 18 layer board

  2. The rest are slides from

  3. SLHC Upgrade R&D Two Concerns about highest rate ME1/1 Chambers 1) CSC Trigger questionable for >2.1 - for rate split strips in half - for $$$ ganged strips 4 strip modulo 4 2) At SLHC Rates conservative estimate shows SCA overuse in ME1/1 at 10%! - neutron background not well known

  4. Digital CFEB – A Nice Idea for the SLHC • Replace Conventional ADC and SCA storage with Flash ADC and Digital Storage • New System Deadtimeless, Removes rate worries • Similar cost to old system • Fairly Radical Idea – Couldn’t build 8 Years Ago

  5. Overall Scope of Upgrade ME1/1 Electronics Upgrade 504 DCFEBs OSU 72 DMBs NE,UCSB 72 TMB (d.c.) TAMU,UCLA 8 MPC Rice 72 LVDB (+more power) 72 LVMB 1008 Cables (default skewclear) Left over boards ME4/2 upgrate

  6. Flash DCFEB R&D Board Status Replace ME1/1 board will be used for ME4/2 upgrade chambers A complex board (18 layers) Analog-Digital Ben Bysma (0.5 FTE) -Schematics complete end of August -Board Layout underway -Board Production October - Results Early November We intend to instrumented a chamber with new electronics during the 7TeV14TeV LHC shutdown

More Related