1 / 37

Tevatron collider, detectors performance and future projects at Fermilab

Tevatron collider, detectors performance and future projects at Fermilab. Feb 28, 2008 Sergei Nagaitsev (thanks to D. Wood, D. Denisov, R. Roser, J. Konigsberg, P. Oddone). Fermi National Accelerator Laboratory. Proton source. Antiproton source. CDF. DØ. Tevatron. Main Injector

snow
Download Presentation

Tevatron collider, detectors performance and future projects at Fermilab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tevatron collider, detectors performance and future projects at Fermilab Feb 28, 2008 Sergei Nagaitsev (thanks to D. Wood, D. Denisov, R. Roser, J. Konigsberg, P. Oddone) Fermi National Accelerator Laboratory

  2. Proton source Antiproton source CDF DØ Tevatron Main Injector\ Recycler S. Nagaitsev (FNAL)

  3. Tevatron complex: 9 accelerators In operation since: Tevatron 1983 Pbar Source 1985 Main Injector 1999 Recycler 2004 Electron cooler 2005 MINOS p Target 120 GeV Main Injector: rapid cycling high intensity proton synchrotron 2 sec period 8 GeV Debuncher: large aperture synchrotron 2 seconds cycle Li Lens MiniBooNE 8 GeV Accumulator: high quality storage ring stochastic cooling ~4 hours cycle Tevatron Collider CM energy of 1.96 TeV 36x36 bunches Collision rate ~ 2MHz p 8 GeV Booster proton synchrotron 15 Hz p 8 GeV Recycler Ring: high quality storage ring stochastic cooling electron cooling 12-24 hours cycle 400 MeV Linac 750 keV p source 4.3 MeV electron cooler S. Nagaitsev (FNAL)

  4. The Luminosity Story… • The Tevatron CM energy is limited to 1.96 TeV. While the Run II energy is greater than Run I’s, Run II is not about energy – its about integrated luminosity. • When science historians write about Run II, they will tell the story of… • How the amount of delivered luminosity impacted the ultimate success of the physics program • The total luminosity will set the scale for the legacy of the Tevatron • We make continuous improvements to physics analysis, thus the physics gain is better than SQRT(∫L). S. Nagaitsev (FNAL)

  5. Total Integrated Luminosity S. Nagaitsev (FNAL)

  6. Tevatron Run 2: 2001 – 2009 (2010) • Two multi-purpose and complimentary detectors: CDF and DØ • Integrated Luminosity • Delivered 3.7 fb-1 (per detector) • Recorded: about 3.0 fb-1 • Goal is 5.5 – 6.5 fb-1 delivered in 2009 • 2010 Running under discussion (expect 7 – 9 fb-1 delivered) S. Nagaitsev (FNAL)

  7. Doing Physics at 2 TeV • Need 1010 collisions to produce 1 event with Top quarks • With 1 fb-1, 10k t-tbar events produced; • Understanding and reducing backgrounds is the key to success • We continue to learn and innovate; developing new tools and techniques as needed S. Nagaitsev (FNAL)

  8. S. Nagaitsev (FNAL)

  9. Tevatron physics goals • More detailed explorations on new areas we’ve opened • Single top, di-bosons, CP in B-physics are all examples • Each benefits from having the largest statistical sample available • Test maximum Ecm • What is in the tails….. • Investigating today’s possibilities • We already see a number of 2-sigma and 3-sigma results in our data based on 2 fb-1 analyzed • Want x3 - 4 our current dataset to find out whether any of these discrepancies arise from new physics • Higgs potential • SM exclusion should be the benchmark • With 7-8 fb-1 of data, we can exclude at the 95% C.L. the entire interesting mass range (< 200 GeV/c2) S. Nagaitsev (FNAL)

  10. The DØ Collaboration DØ is an international collaboration of 580 physicists from 19 nations who have designed, built and operate the DØ detector at the Tevatron and perform data analysis Collaborators: ~ 50% from non-US institutions ~ 100 postdocs, ~140 graduate students September 2007 DØ Collaboration Meeting Institutions: 89 total, 38 US, 51 non-US S. Nagaitsev (FNAL)

  11. Tracker Solenoid Magnet protons antiprotons 3 LayerMuon System DØ : Physics Goals and Detector • Precision tests of the Standard Model • Weak bosons, top quark, QCD, B-physics • Search for particles and forces beyond those known • Higgs, supersymmetry, extra dimensions…. • Driven by these goals, the detector emphasizes • Electron, muon and tau identification • Jets and missing transverse energy • Flavor tagging through displaced vertices and leptons 20 m S. Nagaitsev (FNAL)

  12. Integrated Luminosity • 2006 shutdown: • new Layer 0 silicon installed • trigger upgrades installed Passed 3fb-1 milestone in recorded luminosity on 16 January 2008 Run IIa Run IIb Jan 08 April 02 S. Nagaitsev (FNAL)

  13. Selected physics highlights from DØ in Run II Single Top December 2006: First evidence for single top and first direct measurement of Vtb • Top physics • Single top production evidence • Tour de force of top quark property measurements • Mass = 172.1±2.4 GeV • Cross section, electric charge, W helicity, forward-backward asymmetry, B(t→Wb)/B(t→Wq) • Electroweak • First evidence for WZ production • W-gamma radiation zero evidence • Anomalous couplings search in W-gamma, Z-gamma, WZ, ZZ • QCD • Precise inclusive jet cross section • with 1% calibration of jet energy scale • W+charm production ratio measurement – probing strange content of proton Inclusive Jets January 2008: most precise measurement of the inclusive jet cross section over the widest kinematic range S. Nagaitsev (FNAL)

  14. Selected physics highlights from DØ in Run II • B-physics • Bs mixing – world’s first two-sided limit • Ξb- baryon discovery: • CP violating parameter measurements: unique DØ capability from regular reversal of magnetic fields • World’s best limits on Bs→μμ decay probability • New Phenomena • W’, Z’ mass limits > 1 TeV • Excited electron mass > 756 GeV: probing electron sub-structure • Best limits on many SUSY processes (tripleptons, stop→l+b+MET, stop→c+MET, diphotons+MET,…) • Searches for squark and gluinos: first Tevatron publication with >2 fb-1 of data • Higgs • SM Higgs cross section limits from nine different channels in 110-200 GeV mass range • Best limits on MSSM higgs production Bs Mixing: March 2006 First two-sided limit on Bs oscillations 17ps-1<Δms<21ps-1 most cited HEP paper of 2006 b- Discovery: June 2007 W’ Limit> 1 TeV: October 2007 M(b-) = 5.774±0.019 GeV/c2 S. Nagaitsev (FNAL)

  15. DØ Physics Output • 2007 was the best year ever with 34 papers submitted for publication • Expect more in 2008 • Reducing time from data taking to publication • Already published result with 2.1 fb-1 • Winter conference results with 2.3 fb-1 expected • DØ continues to be a great training ground for students and postdocs • 29 Ph.D. theses in 2007 S. Nagaitsev (FNAL)

  16. The CDF Collaboration Europe 21 institutions North America 34 institutions Asia 8 institutions The CDF Collaboration 15 Countries 63 institutions 635 authors S. Nagaitsev (FNAL)

  17. Detector Status - Summary • Stable data collection • ~85% recorded and ~80% of delivered used in analysis • Tracking chamber (COT) • Aging not a problem, will be ok through 2010 • Silicon longevity • Expect silicon detector to last beyond 2010 • Radiation not expected to be a problem • All other systems are operating well • High Luminosity Running • Inst. Lum expectations are now clear < 300-350 x1030cm-2 s-1 • Trigger & DAQ • Recently completed upgrade on tracking and calorimeter • We are collecting high-Pt data with high efficiency up to 3x1032 • Physics • No significant effect up to 3x1032 • About 80% of Delivered Luminosity is available for physics analysis • Expected to be in good shape through FY10 S. Nagaitsev (FNAL)

  18. CDF: Collecting data - happily… ~<85>% efficient since 2003 • 1.7 MHz of crossings • CDF 3-tiered trigger: • L1 accepts ~25 kHz • L2 accepts ~800 Hz • L3 accepts ~150 Hz • (event size is ~250 kb) • Accept rate ~1:12,000 • Reject 99.991% of the events • Sources of inefficiency include: • Trigger dead time and readout ~ 5% • Intentional - to maximize physics to tape • Start and end of stores ~5% • Problems (detector, DAQ) ~5% S. Nagaitsev (FNAL)

  19. CDF: Physics Highlights from 1-2 fb-1 Observation of Bs-mixing Δms = 17.77 +- 0.10 (stat) +- 0.07(sys) Observation of new baryon states b and b WZ discovery (6-sigma) Measured cross section 5.0 (1.7) pb ZZ observation 4.4-sigma Single top evidence (3-sigma) with 1.5 fb-1 cross section = 2.9 pb |Vtb|= 1.02 ± 0.18 (exp.) ± 0.07 (th.)‏ Measurement of Sin(2_s) Most are world’s best results Precision W mass measurement Mw_cdf = 80.413 GeV (48 MeV) Precision Top mass measurement Mtop_cdf = 172.7 (2.1) GeV W-width measurement 2.032 (.071) GeV Observation of new charmless B==>hh states Observation of Do-Dobar mixing Constant improvement in Higgs Sensitivity S. Nagaitsev (FNAL)

  20. extrapolated from FY09 8.6 fb-1 FY10 start 7.2 fb-1 Real data up to FY07 (included) Highest Int. Lum Lowest Int. Lum FY09 and FY10 integrated luminosities assumed to be identical FY08 start Run II Luminosity – Where can we go? Luminosity projection curves for 2008-2010 S. Nagaitsev (FNAL)

  21. Antiprotons and Luminosity • The strategy for increasing luminosity in the Tevatron is to increase the number and brightness of antiprotons • Increase the antiproton production rate • Provide a third stage of antiproton cooling with the Recycler • Increase the transfer efficiency of antiprotons to low beta in the Tevatron • Provide additional antiproton cooling stages S. Nagaitsev (FNAL)

  22. Beam lifetimes at HEP collisions • Antiproton lifetime is improved and brightness has increased due to beam cooling in Recycler ring at 8 GeV • Proton lifetime started to suffer from small pbar emittances • Pbars 3-4 times smaller than protons • Greater fraction of proton bunch sees strongest beam-beam force • Highest head-on tune shifts for protons > 0.024 • Using an injection mismatch in Tevatron to blow up antiproton emittance slightly and improve proton lifetime • Results in slightly lower peak luminosities • Improved integrated luminosities due to better proton lifetimes S. Nagaitsev (FNAL)

  23. Tevatron • When does the program stop? • The “natural” life without the LHC would be several more years, roughly at the end of “doubling data in three years” • Very difficult to predict when it will be overtaken by LHC. Prudent to plan running in 2010 – depends on funding scenarios. S. Nagaitsev (FNAL)

  24. Fermilab: Neutrino experiments MINOS: neutrino oscillations in the atmospheric region; coming electron appearance at CHOOZ limit or below Minos Far detector MiniBooNE: neutrino oscillations in the LSND region; exploration of low energy anomaly in neutrino interactions SciBooNE: neutrino cross sections MiniBooNE detector S. Nagaitsev (FNAL)

  25. LHC and Fermilab • The LHC is the single most important physics component of the US program • Fermilab supports the US CMS effort. Built major components of CMS supporting the universities. • Now have Tier 1 computing center, LHC Physics Center, Remote Operations Center (ROC), CERN/Fermilab summer schools • Major contribution to the accelerator. We are now helping to commission LHC. • To continue to be welcome, US and Fermilab must contribute to detector and accelerator improvements. • Aim: critical mass at Fermilab, as good as going to CERN (once detectors completed). S. Nagaitsev (FNAL)

  26. LHC and Fermilab Compact Muon Spectrometer CMS Remote Operations Center at Fermilab S. Nagaitsev (FNAL)

  27. High-energy physics tools pp-bar pp e+e- m+m- Energy Frontier Intense n, m, K, .. beams; and B, C factories; Intensity Frontier Non-accelerator based Telescopes; Underground experiments; S. Nagaitsev (FNAL)

  28. Need a TeV-scale lepton collider International Linear Collider (ILC) ILC e- e+ LHC pp S. Nagaitsev (FNAL)

  29. ILC technology at Fermilab Horizontal Test Stand 29 First cryomodule Vertical Test Stand S. Nagaitsev (FNAL)

  30. ILC and Fermilab • Strong world-wide collaboration on ILC: by far the easiest machine beyond the LHC; both CLIC and muon colliders are more difficult. • ILC will be it – provided LHC tells us the richness of new physics is there. • Technology is broadly applicable – R&D on the technology is important: electron cloud effects, reliable high gradient cavities, final focus…. • Fermilab and US community will continue with ILC and SCRF R&D – probably on stretched timescale. • Reality: the likelihood of building ILC in the US is much reduced after the latest round of Congressional actions on ILC, ITER. S. Nagaitsev (FNAL)

  31. Intensity frontier • The general rule: • If the LHC discovers new particles – precision experiments tell about the physics behind through rates/couplings to standard particles • If the LHC does not see new particles – precision experiments with negligible rates in the SM are the only avenue to probe higher energies • Additionally, neutrino oscillations coupled with charged lepton number violating processes constrain GUT model building S. Nagaitsev (FNAL)

  32. Fermilab and the intensity frontier • We have designed a program based on a new injector for the complex. • Can exploit the large infrastructure of accelerators: Main Injector (120 GeV), Recycler (8GeV), Debuncher (8 GeV), Accumulator (8 GeV) – would be very expensive to reproduce today • New source uses ILC technology and helps development of the technology in the US • Provides the best program in neutrinos, and rare decays in the world • Positions the US program for an evolutionary path leading to neutrino factories and muon colliders S. Nagaitsev (FNAL)

  33. Fermilab and the intensity frontier: Project X S. Nagaitsev (FNAL)

  34. Project X: expandability • Initial configuration exploits alignment with ILC • But it is expandable (we will make sure the hooks are there) • Three times the rep rate • Three times the pulse length • Three times the number of klystrons • Would position the program for a multi-megawatt source for intense muon beams at low <8 GeV energies – very difficult with a synchrotron. • Neutrino program at 120 GeV (2.3 MW); 55% Recycler available at 8 GeV (200kW) • We can develop existing 8 GeV rings to deliver and tailor beams, allowing full duty cycle for experiments with the correct time structure: K decays, m e conversion, g-2. S. Nagaitsev (FNAL)

  35. NEUTRINO FACTORY Muon ColliderR&D Hall Rebunch (Upgradable to 2MW) Pre-Accel Cool Decay Phase Rot.& Bunch 0.2–0.8 GeV Target PROJECT X 4 GeVRing MUON COLLIDERTEST FACILITY RLA (1–4 GeV) Illustrative Vision Three projects of comparable scope:  Project X (upgraded to 2MW)  Muon Collider Test Facility  4 GeV Neutrino Factory Far Detectorat Homestake n Example: evolutionary path muons S. Nagaitsev (FNAL)

  36. 1.5-4 TeVMuon Collider at Fermilab RLA Linac 2 detector  Muon Collider RLA Linac 1 Project X -factory beam MCTF Final Cooling 36 S. Nagaitsev (FNAL)

  37. Summary • Tevatron collider has a very rich and exciting physics program. Detectors are running well (actually better than ever). • Tevatron is running well • There is evidence for reliability improvements • Plan to run Tevatron until overtaken by LHC • Our future plan is to construct world premier “intensity-frontier” machine and to continue R&D on a lepton “energy-frontier” collider S. Nagaitsev (FNAL)

More Related