Valuation of Natural Gas in Salt Cavern Storage Facilities

Valuation of Natural Gas in Salt Cavern Storage Facilities. Michael Bond Hank Grant PhD. Natural Gas Consumption. 1997-2007: 23 Trillion Cubic Feet/Year All US Production 4.6 Tcf Imported Pipeline (Canada & Mexico) Liquid Natural Gas. Natural Gas Use. Necessity for Storage .

siran
Download Presentation

Valuation of Natural Gas in Salt Cavern Storage Facilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Valuation of Natural Gas in Salt Cavern Storage Facilities Michael Bond Hank Grant PhD

  2. Natural Gas Consumption • 1997-2007: 23 Trillion Cubic Feet/Year • All US Production • 4.6 Tcf Imported • Pipeline (Canada & Mexico) • Liquid Natural Gas

  3. Natural Gas Use

  4. Necessity for Storage • Other commodities • production is seasonal • consumption is relatively level • Natural Gas • production is relatively level • Short term • consumption is seasonal • Residential – Winter • Power generation – Summer (lesser) • Investment opportunity

  5. Seasonality of Gas Prices

  6. Gas In Storage

  7. Types of Gas Storage • Above Ground • Liquid NG • Containers • Local distributors • To meet local daytime peak usage

  8. Types of Gas Storage • Underground • Depleted gas reservoir • Aquifer • Salt Cavern • *Mines • *Natural caves/caverns • * Minor usage

  9. Underground Storage Facilities

  10. Depleted Reservoir • Most common • Depleted gas field • 1 Turnover/year • 24-36 months construction time • Structural considerations – • Any area with natural gas field

  11. Aquifer • Very high cushion gas requirement • irrecoverable • 1 turnover/year • Wherever aquifers exist • Most expensive

  12. Salt Cavern • Constructed in salt dome • Higher Pressure • Least cushion gas • Turnover 4-5/year • Longest to construct 36-48 months • Gulf Coast, Great Lakes area

  13. Salt Dome Cavern

  14. The Lille Torup gas storage facility has seven gigantic cavities (200-300m by 50-75m) called caverns at a depth of 1.2 and 1.5 km in a large subterranean salt dome.

  15. Salt Deposits

  16. Compare Salt Cavern with Reservoir Type • Examine operational differences • Is there a financial advantage?

  17. Approach • Set initial parameters • Gas on hand • Cash on hand • For a period of 1 year • Generate daily decision to buy, hold or sell • Stochastic • Estimate future decisions • Adjust if necessary • Gas cannot exceed capacity • Cannot sell gas not on hand • Calculate change in gas and cash

  18. Approach • Create simulation with AWESIM • Evaluate results

  19. Model - Assumptions • No holding costs • No injecting/withdrawal costs • Static injection/withdrawal rates • Monthly Price changes

  20. Injection time 45 days (V45) Volume=V Inject rate= R Price = P Cost = C Injection time 180 days (V180) Volume = 4V Inject Rate = R/4 Model - Parameters

  21. Gas prices

  22. Performance • Trivial pricing • Same transactions • Equal profit

  23. Simple Single Peak Pattern • Most common pattern • Winter demand • V180- 6 months inj then 6 months w/d • Same profit

  24. Various Patterns • Same results

  25. Initial results • Given equal states • Transaction activity (volume) • Knowledge of future prices • Equal profits • Intuitive

  26. Future Prices • Difficult to predict the future • Forecast Methods • Based on historical • Random Variation • Mean Reverting • Mean Reverting with Spikes

  27. Real Options Theory • Consider Financial Instruments • Options – to buy or sell stock • Potential Business opportunities = • Buy Options • Ex: Undeveloped Gas Reserve • Commodities in storage = • Buy or Call Options

  28. Black-Scholes - Evaluating options • Current Cost (Spot) • Future Price (Strike) • Volatility of prices • Risk free interest rate (US T-Bills) • Time (years) • Normal Distribution

  29. V180 Injection Pattern • Injection season 180 days • Low demand • Lower prices • Summer • Withdrawal Season • Higher Residential Demand • Higher prices • Winter

  30. Sensitivity to Volatility • Shorter cycle time • Take advantage of short-term price spikes

  31. V180 vs V45 • V45 cf/y greater • V45 cost per injected cf lower

  32. Summary • Continuing to investigate • Quantify Salt Cavern advantage • Single Cavern Facility vs Multi-Cavern