Industry lng seminar institute of mechanical engineers 11 february 2009
Download
1 / 10

Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009 - PowerPoint PPT Presentation


  • 70 Views
  • Uploaded on

Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009. Abdulrahman Al Mannai Commercial Manager. Qatargas II Supply Chain. Gas. Onshore Liquefaction (2*7.8 MTPA Trains). North Field Gas Production. LNG. LNG. Shipping. Q-Flex (~215 km 3 ), Q-Max (~265 km 3 ). Gas to

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009' - simone-castro


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Industry lng seminar institute of mechanical engineers 11 february 2009

Industry LNG SeminarInstitute of Mechanical Engineers11 February 2009

Abdulrahman Al MannaiCommercial Manager


Qatargas ii supply chain
Qatargas II Supply Chain

Gas

Onshore Liquefaction (2*7.8 MTPA Trains)

North Field Gas Production

LNG

LNG

Shipping. Q-Flex (~215 km3), Q-Max (~265 km3)

Gas to

Pipeline

Regasification. South Hook can process up to 15.6 MTPA lean LNG (21 bcma gas)


Background south hook terminal
Background – South Hook Terminal

South Hook LNG Terminal Company Ltd is a joint venture between subsidiaries of:

(24.15%)

(8.35%)

(67.5%)

  • South Hook Facilities designed and constructed in two phases

    • Each Phase with an annual gas redelivery capability of ~10.5 bcma

    • To match the capacity of the Qatargas II upstream facilities

  • SHLNG has been granted exemption from regulated Third Party Access for both phases of capacity and a duration of 25 years from commercial start date.

    • Enabled South Hook Gas to purchase all primary capacity for QGII LNG


Commercial relationships
Commercial Relationships

Qatar

United Kingdom

LNG

GAS

ExxonMobil Gas

Marketing Europe Limited

GAS

LNG


Capacity timeline
Capacity Timeline

Base

Firm

Redelivery

Capacity

Base

Firm

Redelivery

Capacity

Daily

Interruptible

Capacity

“UIOLI” SHB

Third Party Services

Terminal Operator Services

SHG purchased

All Terminal

Firm Capacity

Capacity Sale

South Hook

Bundles

(SHB)

QGII

D-14

SHLNG

SHG

SHG &

AdditionalUsers

AdditionalUsers

SHG &

AdditionalUsers


South hook bundles
South Hook Bundles

  • Secondary capacity sales will be in the form of South Hook Bundles (“SHB”) that will specify

    • Berthing slot date

    • Temporary LNG tank storage space

    • Redelivery capacity

    • LNG quality

  • SHBs can be advertised for re-sale on our Electronic Bulletin Board

space

time

capacity

time


Terminal operator uioli services
Terminal Operator “UIOLI” Services

“UIOLI” SHB example 1

“UIOLI” SHB example 2

LNG Space

LNG Space

time

time

Berthing

Berthing

Redelivery profile

Redelivery profile

  • Advertised on the website 14 days ahead of a berthing slot

  • Auctioned over 4 days ending 10 days before the berthing slot.

  • Gas redelivered over a 7 day period

  • Users apply via EBB.


Terminal operator uioli services cont
Terminal Operator “UIOLI” Services (cont.)

  • Terminal Operator facilitates the optimisation of unused redelivery capacity

  • Users allowed to nominate above their firm capacity

  • Unused redelivery capacity on the day will be recycled and allocated as interruptible capacity for other Users

  • Allocation is pro rata to firm capacity rights

Unused capacity

Available Capacity

Interruptible Capacity

Aggregate nominations

time


Commissioning schedule
Commissioning Schedule

  • The first commissioning cargo “Tembek” has left the Arabian Gulf en route for Milford Haven. 

  • Commissioning is an intensive activity, commercial operations (Phase 1) is currently forecast to commence in the second half of April

    • Sendout is under the control of the Terminal Operator during this period

    • SHLNG will provide schedule updates on its website

  • Commissioning process ongoing


Application to become a user
Application To Become a User

A party will need to apply and be accepted as a User of the terminal before it can hold capacity.

A Confidentiality Agreement will need to be signed before all other relevant documents are released

SHLNG to publish the steps required to become a User on its website during March 2009

www.southhooklng.com

Parties interested in the products and services available from SHG should contact Donovan Waite, Head of Trading and Business Development

www.southhookgas.com


ad