MORRIS MILL PROPOSED URBAN SERVICES DISTRICT. Presentation to County Council September 17, 2013. Wicomico County Code Section 97.4.

sibyl
Download Presentation

MORRIS MILL PROPOSED URBAN SERVICES DISTRICT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013

  2. Wicomico County CodeSection 97.4 • “The Commission shall advise those present at the hearing whether, on the basis of the engineering and financial surveys, it believes the project feasible from both an engineering and financial standpoint.”

  3. Morris Mill Presentation • Review Area of Concern • Contamination Statistics • Number of Properties and SDAT Value • Project Scope and Anticipated Costs • Current Status of Funding • Impact on Homeowners • Cost to County • Process to Move Forward

  4. Water Sample Results

  5. Updates Since November 2012 Sampling • 77 total wells have detections: 28% • 45 wells above maximum contaminant level of 5 ppb (previously 43) • 16 wells with detections above action level of 2.18 ppb • 16 wells with detections below action level of 2.18 ppb • 7 wells previously non-detect, now have detections Since November 2012, concentrations have increased in 30 wells; slight decreases in 10

  6. Updates Continued • 38 residences on granular activated carbon (GAC units) • EPA funding extended additional six months to 5/2014 • Varying O&M depending on concentrations (some “pass through” occurred in residences with higher concentrations) • MDE will likely turn the O&M of GAC units back to homeowners if public water is not extended • New wells may not be permitted

  7. Project Scope Address public health concern and provide long term solution for a safe drinking water source for residents. • Planning study completed to evaluate alternatives for solution. • No Action • Public Water Supply • Individual Point of Use (POU) Water Treatment Systems • Community Water Treatment System • Develop Urban Service District to manage and maintain.

  8. Anticipated Cost • 2.125% Interest, 40-yr Loan • County Subsidy is estimated and ultimately dependent on County Council approval.

  9. Recommended Project Alternative Public Water Service provide by City of Fruitland, MD • Phase 1: • Installation water mains in Morris Mill Area • 6-inch, 8-inch and 12-inch mains • Phase 2: • Installation elevated water tower to provide pressures • Interconnection loop between City of Fruitland and Morris Mill Area

  10. Anticipated Cost- Public Water • 2.125% Interest, 40-yr Loan • County Subsidy is estimated and ultimately dependent on County Council approval.

  11. Timeline Project Completion Urban Service District Created January 2014 Design, 6 months January 2014- June 2014 Advertise / Bid July 2014 Construction , 18 months August 2014- February 2016

  12. Financial Considerations • SDAT Value of Associated Properties is $48M • County Investment of $2M represents 4.2% of Total Value • Annual P & I represents 16.26% of Current Associated Real Property Taxes • Loss of Property Value & Marketability

  13. Impact on Affected Residents • PER Summary • Plumbing From Line to Homes Included at $1,500 per Residence • Existing Wells Can Be Used for Irrigation • Some Private ROW May Be Needed for Water Lines

  14. Timeline – No Petition • September 17- Urban Services Commission meets and is presented information on the project. Preliminary decision is made that this project is feasible and appropriate from an engineering and financial standpoint. Vote to move to public hearing stage. • Public hearing must be advertised for 3 weeks. • Handbills must be posted and circulated in the proposed district.

  15. Public Hearing • Week of October 21st – Commission holds a public hearing. • Commission informs citizens of the contents of the engineering and financial surveys and the probable cost of providing service in the district, including all fees and expenses. • At the public hearing, the Commission shall vote, based on the engineering and financial surveys that the project is feasible from both engineering and financial standpoints and to create the urban services district.

  16. Timeline – No Petition Continued • The citizens in this area have 45 days to petition for a vote. • No petition or petition fails. Council proceeds with the legislation to create the urban services district. • December 17th approximate date for introduction of the legislation. • 2 weeks of advertising for the public hearing. • January 7th approximate date for the public hearing. Vote on legislation on the 7th or January 21st.

  17. Timeline - Petition • September 17- Urban Services Commission meets and is presented information on the project. Preliminary decision is made that this project is feasible and appropriate from an engineering and financial standpoint. Vote to move to public hearing stage. • Public hearing must be advertised for 3 weeks. Handbills must be posted and circulated in the proposed district. • Week of October 21st – Commission holds a public hearing. See public hearing slide.

  18. The citizens in this area have 45 days to petition for a vote. (ends approximately the first week in December) • There is a successful petition. Must be signed by the owners of 20% of the assessed value of the land in the proposed district to succeed. • Must have a vote within 30 days. The time, place and hours of balloting must be advertised for 3 weeks and posted within the district. • Vote – Approximately the first full week in January.

  19. Each owner has 1 vote for $500 of assessed valuation of his land. Needs majority to pass. • Citizens vote to create the urban services district • January 21st approximate date for introduction of the legislation. • 2 weeks of advertising for the public hearing. • February 18th approximate date for the public hearing. Vote on legislation on the 18th or March 4th.