An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting August 19-20, 2013

  2. SoLID Status Update • Main Progress: • Magnet: Formal request/response (completed) • (thanks to JLab management/physics division/Hall A) • Background: • Main background for PVDIS/baffle design/optimization (Zhiwen’stalk) • Identify source/profile ofbackground (Rich’s talk) • Radiation (including neutron) background (Lorenzo’s talk) • EM calorimeter: • Update on pile-ups from background(Zhiwen’stalk) • Impacts on trigger and PID • Support structure design • Light Cherenkov: • Simulation with background (Michael’s talk) • Impact on trigger and PID • Combined with EC • QAD/Trigger System: • Updated design with new inputs from EC/LC (Alexandre’stalk) • Simulation/test stand

  3. SoLID Status Update (II) • Progress on p-CDR • Project introduction/overview (newly added) • Major subsystem, conceptual design complete • Finalize EC/LC full simulation with realistic background • Finalized trigger/DQA design with new inputs from EC/LC • GEM modification (4 planes to 5 to be safe) • Freeze (in a week?) • Other progress: • GEMs- China progress (Yuxiang’s talk) • GEMs R&Ds/test run/production for SBB (Nilanga’s talk) • Tracking (Ole’s talk) • Heavy Cherenkov: Space availability (Mehdi’s talk) • Support structure • New collaborators

  4. Milestone, Schedule • pCDR“freeze” and ready to be released: this month • Director’s review: October? (dry-run) • Discussion with DOE: in a few months? • Submit MIE/MRI: Late 2013/early 2014? • CD process: 2013-2015? • Full simulation: continuing • Pre-R&D: starting now • CDR/TDR