Ferry boat terminal. Daryl toy Rensselaer polytechnic institute Fall 2013. Urban & Historical context. Pons Aemilius - 1 st stone bridge built across the Tiber River: 181 BC. Ponte P alatino built in 1886 AD. Site. Site. Site. overview. overview. TICKETING WAITING AREA.

Download Presentation

Ferry boat terminal

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ferry boat terminal

Daryl toy

Rensselaer polytechnic institute

Fall 2013


Urban & Historical context

Pons Aemilius - 1st stone bridge built across the Tiber River: 181 BC

Ponte Palatino built in 1886 AD


Site


Site


Site


overview


overview

TICKETING

WAITING

AREA

ENTRANCE

DOCKING AREA


PATHWAY

B.

A.

A. CORNER EXPERIENCE

B. VIEW ASCENDING RAMP


PATHWAY

A.

B.

A. SIDE VIEW

B. VIEW FROM WAITING AREA


PATHWAY & RAMP

A.

B.

A. ASCENDING LOWER RAMP

B. WATER CHANGE & MOBILITY OF RAMPWAYS

.


Ramp and changing water levels

UPPER TRACK SYSTEM

LOW WATER

HORIZONTAL SHIFT

HIGH WATER


Handrail detail

HORIZONTAL SHIFTS

PLAN

HORIZONTAL SHIFTS


Ramp detail

EXPLODED AXON RAMP DETAIL

RIGID SUSPENSION MEMBER DETAIL

RAMP SECTION


Beam design

SCALE

GENERATIVE DESIGN

EXISTING BEARING CONDITIONS

TRUSS & SKIN


Structural diagram


ELEVATION