1 / 1

ITS/CVO Program - CVISN Deployment Roadmap

ITS/CVO Program - CVISN Deployment Roadmap. MD. KY. VA. Key. = Project under initial development = Incremental updates to project = CVISN Level 1 Capability. VISTA/RS. VISTA/TS. JHU/APL 18 Apr 2000. DOT/FMCSA Web Site:. http://www.fhwa.dot.gov/. JHU/APL CVISN Web Site:.

Download Presentation

ITS/CVO Program - CVISN Deployment Roadmap

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITS/CVO Program - CVISN Deployment Roadmap MD KY VA Key = Project under initial development = Incremental updates to project = CVISN Level 1 Capability VISTA/RS VISTA/TS JHU/APL 18 Apr 2000 DOT/FMCSA Web Site: http://www.fhwa.dot.gov/ JHU/APL CVISN Web Site: http://www.jhuapl.edu/cvisn/ CY 2001 CY 2000 Outyears Calendar Years / Quarters CY 1999 CY 2002 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 2003 2004 2005 Policy & Management Continuing CVISN Development & Deployment Policy Architecture Utilization & Conformance Policy FY02 Funding of Selected States FY03 Funding of Selected States FY04 Funding of Selected States Fund Model Deployment Completion FY01 Funding of Selected States Oct 98 TEA-21 Highway Reauthorization Bill ITS/CVO Regional Coordination Plans State CVISN Program Plans State ITS/CVO Business Plans Private / Public Agreements State Operational Practice Agreements CVISN Program Review Mainstreaming Forums ITS Deployment Tracking ITS Deployment Tracking ITS/CVO O&M Policy & Planning Shift to O & M Mode O & M Architecture & Standards CVISN Level 2 & 3 Development DSRC-Approved Std (IEEE & ASTM) XML White Paper and Survey EDI TS 285 Draft Standard for Trial Use (DSTU) EDI TS 286 DSTU Oct 96 DSRC V7 Products Widely Available EDI TS 285 Production Intelligent Vehicle Initiative (IVI) Jun 97 EDI TS 286 Production Jul 97 Architecture & Standards Maintenance CVISN Architecture Baselined Dec 96 CVISN Level 1 Model Deployment Nationwide Deployment Most Pilot States will achieve CVISN Level 1 in Year 2001 First States to Achieve CVISN Operational Level 1 Management & System Integration In 1997, each Model Deployment Initiative State completed a CVISN Program Plan and a State CVISN Top-Level Design for each Program Area. CO CT CA WA MN MI OR Oregon dropped out Safety Information Exchange SAFER SAFER SAFER V4.0 V3.0 V1.5 CVIEW CVIEW CVIEW V4.0 V3.0 V1.6 MD VA VA MD VA MD New Deployment States expected to achieve CVISN Level 1 beginning in Year 2002 ASPEN/AVALANCHE ASPEN/AVALANCHE ASPEN/AVALANCHE V1.4 V1.3/1.4 V1.5 Credentials Administration Incremental Deliveries of CA Systems VISTA/RS VA VISTA/TS VA IDT InterCAT/CI IDT InterCAT/CI MD MD IRP T & T IRP T & T NY RPC IFTA CH IRP CH Electronic Screening I-95 Perryville I-95 Perryville MD Stephens City, ROC Technical Level 1 Capability Operational Level 1 Capability VA Stephens City, ROC Technical Level 1 Capability VA Operational Level 1 Capability Status of States’ CVISN Deployment Interoperability Test Initial Test Preparation MDI States Interface Pairs Testing • Prototype States Test • Group 1 End-To-End • Inspection reporting • Credentials update to snapshots • Electronic screening • Prototype States Test • Group 1 Pairwise • CAT - CI • CVIEW - SAFER • DSRC Reader - Tag MDI States End-to-End Testing Interoperability Testing to Support Deployment Set 3 Interoperability Tests Defined Set 2 Interoperability Tests Defined Set 1 Interoperability Tests Defined Technical Support Lessons Learned Used to Continually Improve and Extend Technical Support Training Tool Kit Advisory Support Guides Deployment Workshops Advisory Support CVISN Web Site & CVISN Tool Kit Deployment Workshops Outreach Guides Technology Truck http://www.jhuapl.edu/cvisn/ The CVISN Guides are a series of documents that provide a means for advising future CVISN deployment state personnel on ;how to make use of what has been already developed and learned by the Prototype and Pilot States. • Motor Carrier Industry Awareness Seminars • ITS/CVO Brochures • Technology Truck • ROVER Van The CVISN Site on the World Wide Web provides planning and technical information for the CVISN Program and is used to distribute program documentation for review and use. Most of the documents produced by JHU/APL are available on this web site. The CVISN Tool Kit is a comprehensive set of technical documentation and planning tools assembled on a CD-ROM to assist states in the deployment of CVISN. The documentation on the Tool Kit will be linked to the CVISN Web Site to allow the user to browse and download the latest versions of CVISN material. • A variety of technical and administrative experts are available to assist the states in achieving their CVISN goals: • JHU/APL CVISN project managers and architecture and standards experts • Experienced personnel from the Prototype and Pilot States, including state project managers, system architects, and functional managers. • ITS/CVO specialists from the FMCSA Division Offices and Service Centers • Personnel from FHWA Headquarters • ITS/CVO Trainers and CVISN State Advisors (CSAs) • ITS America Staff • Motor carrier associations staff [American Trucking Associations (ATA), National Private Truck Council (NPTC), Owner-Operator Independent Driver Association (OOIDA) and others] • State associations staff (AAMVA, CVSA, IRP Inc., IFTA Inc., and others) After completing the ITS/CVO Training Classes, State Teams prepare their CVISN Top-Level Design and Program Plan during a series of workshops SAFER and CVIEW Documentation • Deployment Workshop Series • Scope Workshop • - Preliminary Top - Level Design • Planning Workshop • - State CVISN Program Plan • Design Workshop • - Review/Update Top - Level Design • SAFER System Overview • SAFER Project Plan • SAFER/CVIEW User and System Requirements Documents • SAFER/CVIEW Logical and Physical Requirements Documents • Snapshot White Paper • SAFER/CVIEW Operations and Maintenance Plans • CVIEW Information Package • CVIEW Requirements Document • CVIEW Design Document Training Courses General CVISN Documents and Standards • Introduction to CVISN • CVISN Statement of Direction • CVISN Operational Concept Document • CVISN Guides (8) • CVISN Operational and Architectural Compatibility Handbook (COACH) (5) • CVISN System Design Description • Lessons Learned Summaries • Examples of Prototype and Pilot State Program Plans • White Papers and Fact Sheets on ITS/CVO Projects • Workshop Session Material and Guidance • Credentialing Interface (CI) Design Document • Credentials Administration Requirements Specification (CARS) • EDI Standards and Implementation Guides • DSRC Standards • Interoperability Test Strategy • Interoperability Test Suite Package • Sample Test Plans • CVISN Glossary • Introduction to ITS/CVO • ITS/CVO Project Management for Non-Technical Managers • Understanding ITS/CVO Technologies • Federal Aid Planning • Architecture Conformance/ Interoperability Testing • Other Hands-On Courses and focused seminars Spreadsheets and Other Tools • Technical and Administrative Point of Contact Information • Planning and Design Worksheets • Representative System Flow (“Thread”) Diagrams • WWW Access Links

More Related