Achieving Value: The How and Why of Value Engineering

Achieving Value: The How and Why of Value Engineering. Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington May 1, 2008. What is Value Engineering?. A systematic problem-solving method Multidisciplinary VE team

sheila
Download Presentation

Achieving Value: The How and Why of Value Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Achieving Value: The How and Why of Value Engineering Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington May 1, 2008

  2. What is Value Engineering? • A systematic problem-solving method • Multidisciplinary VE team • Structured process: 5-day (40-hour) study • Conducted on capital improvement projects to save money without compromising function • And to enhance function within the Owner’s budget • VE usually pays for itself on projects over $5 million • Requirement to conduct VE on projects over $25 million involving federal funding

  3. The Value Equation V = F/C Where V = Value from the Owner’s Eyes F = Function C = Cost

  4. History of VE • Larry Miles, Father of Value Analysis, GE, WWII • DoD adopted VE in 1954 for US Navy Bureau of Ships • Got the Job done Faster, with Limited Resources • Charles Bytheway introduced “Functional Analysis” to the VE Process • VE is Huge in Manufacturing • VE Process is applied to Capital Improvement Projects: Water, Wastewater, Transportation, Public Sector Buildings • SAVE International – The Value Society

  5. Why Use Value Engineering? • Focuses on essential functions, not systems or procedures • Embraces creativity and out-of-the-box thinking • Uses life-cycle cost analysis for decision-making • Provides and organized, multi-disciplinary framework for creative alternative development • Consistently achieves desirable results: ROI from 5:1 to 50:1 and higher; or savings >5% of estimated project cost

  6. Opportunities for Savings 10% Design Completion Construction Complete 25% Design Completion Award of Contract Cost of Change Facility Costs Cost Reduction Potential Break Point Time

  7. Value Engineering Employs Six Steps • Information • Creative • Analysis • Development • Presentation • Implementation

  8. When to Use Value Engineering • At Concept-Level to select a preferred design approach if several alternatives are envisioned to meet the project requirements • High Opportunity for cost savings or functional enhancement at the early-to-mid design phase • Too late to incorporate VE at the late design phase (VE is not a Constructability Review)

  9. VE Examples • Example VE Proposal • Narrative discussing current design vs. VE alternative • Supporting Calculations • Supporting Sketch • Summary Table

  10. Achieving Value • Tupelo, MS WWTP • Suggested VE Savings: $1 million • Accepted VE Savings: $500,000 • NDOT Boulder City Bypass • Concept Level VE with 5 highway alignment alternatives • VE team selected and refined a sixth alternative for functional enhancement and $35 million savings on a $170 million project • ROI typically in excess of 5:1 • Accepted savings as % of construction usually greater than 5%

  11. Summary • History of VE • What VE is and isn’t • When to do VE and on what projects • How VE is implemented • Why VE is conducted • Value Achieved from VE Q/A