Lone star region
Sponsored Links
This presentation is the property of its rightful owner.
1 / 47

Lone Star Region PowerPoint PPT Presentation


  • 70 Views
  • Uploaded on
  • Presentation posted in: General

Lone Star Region. National Model Railroad Association “The Shack” Scratch Build -Mike Jobe. The Shack. Session 1 Preparations Framing Session 2 Siding Lettering / Weathering Final Assembly. Lone Star Region. Prepping to build. Prepping to build.

Download Presentation

Lone Star Region

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Lone Star Region

National Model Railroad Association

“The Shack” Scratch Build -Mike Jobe


The Shack

  • Session 1

    • Preparations

    • Framing

  • Session 2

    • Siding

    • Lettering / Weathering

    • Final Assembly


Lone Star Region

Prepping to build


Prepping to build

You should have a flat study surface to work on,

I typically use glass, this is a shelf from an old refrigerator.


Prepping to build

Cut the plans down so that you can fit them within your work area.

Always keep additional copies of your plans because you will destroy

the one used for the build.


Prepping to build

Using masking tape place the plan onto the work surface, make sure

it is flat and true.


Prepping to build

Cut a piece of wax paper and place it shiny side up over your

plan. Again make sure it is flat.


Lone Star Region

Framing


Framing

Place 3 small spots of glue here

Take a flat razor and wipe off any

Excess glue that ooze's out

This block of wood will keep everything straight and true. Allow to dry.


Framing

Cut a piece to length

and place the footer first

Using a toothpick

add 2 small dots

where the footer

will be placed.


Framing

Cut wall studs that are slightly

longer than the plan and begin

to construct wall.

Using a toothpick

add 1 small dot on the

plan at the top of the stud.

Dip the bottom end of

the stud in glue (very

little needed) and

position into place.


Framing

Add Glue Here

Using toothpick add dot of glue and to side of studs.


Framing


Framing

Using the razor, cut the studs along

the roof line exactly removing the excess

wood material, take your time and make sure

that you follow the line as best as possible.


Framing

The cut should look like this when complete....


Framing

Place Glue

Carefully remove the bottom

block


Framing

Add Studs but stop here

Add Footer

Add block

Repeat the same techniques as with the front wall


Framing

Double up this stud

Double up

2 more studs and

glue them to the

footer using the door

as a guide, do not glue

the door in at this time.

Add the door

so that the edge rides

on the double stud


Framing

Now add the headers the door should still be loose


Framing

If the door you have has a threshold slide the

door up, remove the large block and then cut the

opening for the door out of the footer.


Framing

Determine where the top of the door is and now

Place a stud across the top of the door way. Do not

Glue the door in yet.


Framing

Using the techniques

you have learned,

continue and construct the

remaining 2 walls and floor

section.


Framing

When you are complete

The door and window(s)

should fit snuggly into the

frame, we will glue these

in place on the next session


Lone Star Region

SESSION 2

Siding / Doors/ Window

Weathering

Final Assembly


Lone Star Region

Siding / Doors/ Window


Siding / Doors/ Window


Siding / Doors/ Window


Siding / Doors/ Window


Siding / Doors/ Window


Siding / Doors/ Window


Siding / Doors/ Window


Lone Star Region

Lettering / Weathering


Lettering / Weathering


Lettering / Weathering


Lettering / Weathering


Lettering / Weathering


Lettering / Weathering


Lettering / Weathering


Lone Star Region

Final Assembly


Final Assembly


Final Assembly


Final Assembly


Final Assembly


Final Assembly


Final Assembly


Final Assembly


Final Assembly


  • Login