skarv idun leverand rseminar
Download
Skip this Video
Download Presentation
Skarv – Idun Leverandørseminar

Loading in 2 Seconds...

play fullscreen
1 / 24

Skarv Idun Leverand rseminar - PowerPoint PPT Presentation


  • 157 Views
  • Uploaded on

Skarv – Idun Leverandørseminar . 6. juni 2007 - Sandnessjøen. Agenda. BP og HMS presentasjon, Øystein Johnsrud BP (30min) Skarv Idun Oppdatering, Kjell Magne Madsen BP – (30 min) LOG/LOG Nord – Leverandørnettverk, Eirik Hansen (LOG Nord) – (20 min)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Skarv Idun Leverand rseminar' - shaw


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
skarv idun leverand rseminar

Skarv – Idun Leverandørseminar

6. juni 2007 - Sandnessjøen

agenda
Agenda
  • BP og HMS presentasjon, Øystein Johnsrud BP (30min)
  • Skarv Idun Oppdatering, Kjell Magne Madsen BP – (30 min)
  • LOG/LOG Nord – Leverandørnettverk, Eirik Hansen (LOG Nord) – (20 min)
  • Rørtjenester i.f.m. Boring, Håkon Haaland (Sumitomo) – (30 min)
  • Stigerør, Harald Bø(Technip) – (30 min)
  • Borerig, Jan B Fossen/Ole Andreas Holm (Awilco) – (30 min)
development concept fpso
Development Concept – FPSO

ResourcesBase Case (Skarv, Tilje, Idun) 425 mmboe

FPSO Production Facility

Design Life 25 years

Accommodation 100 POB (single cabins)

Oil Production Capacity 85,000 bbls/d

Gas Plant Capacity 670 mmscfd

Gas Export capacity 650 mmscfd

Gas Injection Capacity 250 mmscf/d

Topsides 16,500 Te

Hull 35,000 Te

Turret / Moorings 9,000 Te

Subsea

Base Case: 16 wells, 5 subsea templates, flexible risers

ExportOil via tandem stern shuttle tanker

export

Gas via new 80 Km 26” spur

pipeline to ÅTS pipeline

SchedulePDO Submission

- End 2Q 2007

First Production

- 3Q 2011

slide6

Skarv FPSO 2

P600

Methanol & Chemical Injection

P400

1st/2nd Stage Recompression 3rd Stage Recompression Fuel Gas,

U800

Power Generation

P200

Export compressors Bulk Loading

FKO Drums

P300

Gas Treatment & Gas Injection

P500

Separation,

Produced Water Treatment

T750

Turret, Turntable TAS

slide7

Skarv FPSO 3

Turret 2100 T

Turntable 2500 T

Swivel 375 T

TAS 1000 T

P600

2111 T

U800

2642T

P500

2163 T

P400

2181 T

P200

2491 T

P300

2055 T

4 Modules

23.2 m x 46.1 m x 9 m high

1 Modules

15.2 m x 46.1 m x 9 m high

1 Module

28.8 m x 50 m x 9 m high

surf overview
SURF Overview

Key Design Features

  • Template Architecture (5 templates)
  • Drill Thro’ Horizontal Trees (16 wells)
  • Manifold Flexibility
    • LP/HP headers
    • GI/GP switch over
    • Multiphase metering
  • Rigid Spools
  • CRA Production Flowline Materials
  • Individual Flowlines (~44 km)
    • Bundle Option
  • Gas lift supply in umbilicals
  • Wet Insulation
  • DEH for Idun
  • Flexible Risers (10 inc export)
  • Static Umbilicals (~21 km)
  • Dynamic Umbilicals (2 control + 1 power)
slide12

Export Pipeline System

  • Ongoing Design Activities
    • On-bottom stability analysis
    • Expansion & buckling analysis
    • Cathodic protection design
    • Tie-in & spool design
    • Material data sheets
  • Spool design optimised
    • L-shaped spools to simplify installation

ERB Piping Layout

ERB Tie-in Layout

PLEM Tie-in Layout

skarv idun en mega utbygging i norskehavet
Skarv Idun en mega-utbygging i Norskehavet
  • PUD inn i slutten av juni 2007
  • PUD forventet godkjent i desember 2007
  • Produksjonsstart august 2011
  • Invisteringer på omkring 30 milliarder kroner
fpso tall i million kroner
FPSO (tall i million kroner)
subsea tall i million kroner
Subsea (tall i million kroner)
boring tall i million kroner
Boring (tall i million kroner)
rockdumping tilbyderliste
Rockdumping - tilbyderliste

Boskalis Offshore

Rosmolenweg 20

P.O. Box 43

3350 AA Papendrecht

The Netherlands

* Mr. S.G.M. van Bemmelen, Proposals Manager: [email protected]

* Mr. B.J.F. de Waard, Proposals Engineer: [email protected]

Tideway BV

Topaasstraat 64

P.: Box 7074

4800 GB Breda

The Netherlands

*Serge Parera [email protected]

*Saskia Albers [email protected])

Van Oord Offshore bv

2 Jan Blankenweg

4207 HN Gorinchem

P.O. Box 458

4200 AL Gorinchem

The Netherlands

Rene van Kessel - Regional Manager - Subsea Rock Installation - e-mail address [email protected]

Steve de Koning - Commercial Manager - Subsea Rock Installation - e-mail address [email protected]

valhall oppdatering

Valhall Oppdatering

6. juni 2007 - Sandnessjøen

valhall nytt feltsenter
Valhall, nytt feltsenter
  • New Facility Design Life - 40 years
  • Hotel - 180 single bed cabins
  • Oil production capacity - 150 mbopd
  • Gas handling capacity - 5 million Sm3/day
  • Total liquid capacity - 200 mbpd (oil & water)
  • Weight topside + hotel ~15 000 tne Weight jacket ~ 7 500 tne
  • Power from Shore - 292 km HVDC cable
  • Oil Export - Future offshore loading/EOR
  • Project Sanctioned Q1 2007
  • Platform start up - 2010
valhall kontrakter
Valhall kontrakter
  • Prosjektering og innkjøp – Mustang (Houston)/Fabricom (Stavanger)
  • Prosjektering og utstyrsleveranse, kraftforsyning fra land, ABB (Oslo/Sverige)
  • Strømkabel design, fabrikasjon og installasjon, Nexans Norge
  • Fabrikasjon av dekk + oppkobling av moduler, Heerema Holland
  • Fabrikasjon av boligkvarter og ”kraftmodul”, SLP UK
  • Stålunderstell, Aker Verdal
  • Prefabrikasjon og offshore modifikasjoner, Aker Kvaerner Offshore Partner Stavanger
  • Undervannsmodifikasjoner, Subsea 7, Stavanger
  • Kontrollsystem, ABB Sandnes/Oslo
hvordan bli en leverand r til bp norge
Hvordan bli en leverandør til BP Norge
  • Identifiser og etabler kontakt med kunden (sluttbruker i BP)
  • Registrerer firmaet i Achilles som godkjent leverandør med oppdaterte opplysninger
    • HMS - Egenvurdering (NORSOK S-006)
    • Produkter/tjenester
  • Oppfyll minimumskrav til HMS.
    • Systemer og prosesser for HMS & K
    • HMS Resulter

HMS spiller en viktig rolle i tildelingen av oppdrag!

Vi finner dere ikke hvis kompetansen deres ikke er registrert!

hva vi ser etter hos leverand rer
Hva vi ser etter hos leverandører
  • HMS ledelse .
  • Oversikt over dokumentert kompetanse
    • De rette produktene/tjenestene
    • Life cycle cost
    • Evne til gjennomføring
    • Ability to deliver vendor data
  • Ønskede egenskaper
    • Bere bruk av teknologi
      • Forbedret driftseffektuvitet
      • Verdiskaping
    • Nyskapende, kreativ, proaktiv
    • Vilje til å dele idéer
bps prinsipper for innkj p
BPs prinsipper for innkjøp
  • Forholder oss til norsk lov (EU Procurement Directive)
  • Bruker Achilles leverandørsystem (www.achilles.no)
  • Foretar pre-kvalifisering når det er nødvendig
  • Opptatt av å utvikle lokal industri til å komme i posisjon
  • Arbeider etter strenge etiske regler - ”BP’s Code of Conduct”
  • Evalueringen foretas etter pre-definerte retningslinjer
  • Evalueringskriterier vil være individuelt tilpasset hvert anbud og vil fokusere
  • på levetidskost, helse-miljø-sikkerhet, kvalitet, referanser, effektivitet etc.