slide1
Download
Skip this Video
Download Presentation
UAS Mission and System Development

Loading in 2 Seconds...

play fullscreen
1 / 9

UAS Mission and System Development - PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on

Overview of the NOAA UAS Requirements and Capabilities Database Matt Lucas NOAA UAS Program TriVector Services, Inc . [email protected] UAS Mission and System Development. Observing Requirement Categories.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' UAS Mission and System Development' - sharla


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Overview of the NOAA UAS Requirements and Capabilities DatabaseMatt LucasNOAA UAS Program TriVector Services, [email protected]

observing requirement categories
Observing Requirement Categories
  • Location– The general area where the measurements are required, also includes altitude of the measurement (i.e. in situ measurements in a tropical cyclone).
  • Minimum Coverage Area – (nm2)Required area of coverage. May be a subset of the location (i.e. for counting mammals, one may make some assumptions about the population distribution that allows them to survey a small area and extrapolate to estimate the total number of mammals)
  • Survey Frequency – (daily, monthly, yearly)
  • Season of Opportunity – (i.e. fall, hurricane season, any time)
  • Measurement Requirements
    • Accuracy/Precision/Resolution
    • Sampling Rate
  • Measurement Resolution– Distance Between Measurements (vertical/horizontal), Image Resolution
  • Data Availability/Delay– Real time data, maximum data delay.
  • Operational Readiness – Maximum allowable time to get to the measurement location.
  • Environment – The environment in which the vehicle/payload must perform it’s mission.
  • Coverage Rate – Coverage Area divided by Elapsed Time (nm2/hr).
requirements overview
Requirements Overview

Mission Centric

Requirements

  • Requirement Attributes:
    • Applicable Instrumentation
    • Applicable Platforms
    • Applicable Subsystems
    • Requirement Owner/Stakeholder
database overview
Database Overview

UAS

Classification

SensorType

The database is developed using FileMaker Pro.

current database statistics
Current Database Statistics
  • Vehicle Information Captured:
    • Performance Data: 70
    • Cost Data: 22
  • Sensors Captured: 47
  • Requirements
    • Mission Requirement Categories: 29
    • Total Mission Requirements: 354
  • Demonstration Missions: 16 of 19 Captured
ad