Overview of the NOAA UAS Requirements and Capabilities Database
Download
1 / 9

UAS Mission and System Development - PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on

Overview of the NOAA UAS Requirements and Capabilities Database Matt Lucas NOAA UAS Program TriVector Services, Inc . [email protected] UAS Mission and System Development. Observing Requirement Categories.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' UAS Mission and System Development' - sharla


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Overview of the NOAA UAS Requirements and Capabilities DatabaseMatt LucasNOAA UAS Program TriVector Services, [email protected]



Observing requirement categories
Observing Requirement Categories Database

  • Location– The general area where the measurements are required, also includes altitude of the measurement (i.e. in situ measurements in a tropical cyclone).

  • Minimum Coverage Area – (nm2)Required area of coverage. May be a subset of the location (i.e. for counting mammals, one may make some assumptions about the population distribution that allows them to survey a small area and extrapolate to estimate the total number of mammals)

  • Survey Frequency – (daily, monthly, yearly)

  • Season of Opportunity – (i.e. fall, hurricane season, any time)

  • Measurement Requirements

    • Accuracy/Precision/Resolution

    • Sampling Rate

  • Measurement Resolution– Distance Between Measurements (vertical/horizontal), Image Resolution

  • Data Availability/Delay– Real time data, maximum data delay.

  • Operational Readiness – Maximum allowable time to get to the measurement location.

  • Environment – The environment in which the vehicle/payload must perform it’s mission.

  • Coverage Rate – Coverage Area divided by Elapsed Time (nm2/hr).


Requirements overview
Requirements Overview Database

Mission Centric

Requirements

  • Requirement Attributes:

    • Applicable Instrumentation

    • Applicable Platforms

    • Applicable Subsystems

    • Requirement Owner/Stakeholder



Database overview
Database Overview Database

UAS

Classification

SensorType

The database is developed using FileMaker Pro.



Current database statistics
Current Database Statistics Database

  • Vehicle Information Captured:

    • Performance Data: 70

    • Cost Data: 22

  • Sensors Captured: 47

  • Requirements

    • Mission Requirement Categories: 29

    • Total Mission Requirements: 354

  • Demonstration Missions: 16 of 19 Captured



ad