POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD. Rebecca Charles – TBE Lynne Perry – TBE Doug Wahl – Exelon. Introduction. Power Plant Perspective – Doug Wahl Laboratory Interface – Rebecca Charles REMP Report Preparation – Lynne Perry.

shakti
Download Presentation

POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER PLANT AND LABORATORY INTERFACE AND DATA MANAGEMENT IN THE ELECTRONIC WORLD Rebecca Charles – TBE Lynne Perry – TBE Doug Wahl – Exelon

  2. Introduction • Power Plant Perspective – Doug Wahl • Laboratory Interface – Rebecca Charles • REMP Report Preparation – Lynne Perry

  3. Power Plant Perspective Doug Wahl

  4. REMP Management – PB & LGS • Stations Own their Program • One Individual Responsible for Implementing Both Programs • Administration and Oversight of Vendors • Perform Required Surveillances • Preparation of Annual Report for Station • POC for NRC Inspections and Issues

  5. REMP Management • The Programs Contracted Out • Normandeau Associates, Inc. • Sample Collection • Land Use Census • Teledyne Brown Engineering • Radiological Analyses • Interlaboratory Comparison Program

  6. Program Implementation Goals • 0% Errors • Standardization • Cost Effective

  7. Common Goals • Eliminate Transcription Errors • Eliminate Calculation Errors • Standardize Paperwork • Electronic Transfer of Data

  8. THE JURASSIC PERIOD

  9. Chain of Custody

  10. THE 20TH CENTURY

  11. Normandeau’s Data Sheet

  12. EXELON • Corporation Formed Merger of PECO and CECO • Included the Three AmerGen Plants • TMI, Oyster Creek and Clinton • Standardization of Programs and Processes • Common Procedure Development

  13. LGS, OC, PB & TMI REMPs • Share Expertise Between Sites • Standardization • Similar Sampling Equipment • Common Vendors • Sample Collection • Analytical Services • Issued New REMP Contracts to Vendors

  14. Laboratory Interface Rebecca Charles

  15. THE 21ST CENTURY

  16. Electronic Transfer of Data • New contract required electronic data deliverable • Exelon defined fields and format • Some data was not part of current login • Decision made to transfer all of field data electronically to Teledyne

  17. Developing the Forms • Process took cooperation • Began with Exelon/Normadeau sample collection sheet • Some modifications required • Rules and training for samplers • Data can be updated • Layout cannot be changed • Must use valid values

  18. New Chain of Custody

  19. ELECTRONIC RECEIPT OF DATA • THE PROCESS

  20. DeliverySample Collection/Receipt Sheets • Forms completed by samplers – Excel files • Emailed to Teledyne email – knoxlab@tbe.com or • Posted on password protected ftp site. • Hardcopy sent with samples • Print area only • Serves as chain-of-custody

  21. Loading data to Laboratory Information Management System (LIMS) • Data is parsed • Data can be viewed before loading • Checker program verifies data • Corrections can be made • Loaded to data base

  22. Laboratory Login (Request for Analysis)

  23. Acknowledgement

  24. Report of Analysis

  25. Advantages of Electronic Transfer of Data • No hand entry at login • No transfer errors • Review time reduced at Teledyne laboratory • Time reduced for Exelon review of acknowledgement • Field data included in Electronic Data Deliverable

  26. REMP Report Preparation Lynne Perry

  27. PAST REMP REPORTS • Individual files faxed, mailed or emailed for review • Complete report put together manually • Sent over night for review

  28. THE FIX • Adobe Acrobat • Combined Word, Excel, bitmap images and Power Point files

  29. REMP REPORTS FOR THE 21ST CENTURY • Complete report for 1st draft • Standardized REMP report for Exelon-East

  30. THE REMP REPORT • Lims query to populate tables • Automatic calculation • Elimination of data entry errors

  31. BENEFITS AND SAVINGS • Normandeau • Elimination of calculation errors • Elimination of data entry errors • Reduction of paperwork • Ease of record retention • 50% MAN-HOURS SAVED PER PLANT

  32. EXELON • Complete Report Data Package • Lab Report, COC, TBE Acknowledgement Sheet, Data Calculation Sheets • Immediate Notification Of Missed Limits • Immediate Receipt Of Reports Or Analysis • Standardized REMP Reports • Standardized Data Base • 108 MAN-HOURS SAVED PER PLANT

  33. TELEDYNE BROWN ENGINEERING • 75% time reduction at login • Elimination of login error • 95% time reduction of login review • Immediate delivery of ROAs • 95% reduction of data entry errors in REMP tables • 50% time reduction reviewing REMP tables • Complete REMP draft available in february • 145 MAN-HOURS SAVED PER PLANT