PRIIA Section 305 Next Generation Passenger Equipment Technical Challenges and Opportunities FRA Railroad Development Perspective. Kevin Kesler Equipment & Operating Practices Division. PRIIA 305 FRA Railroad Development Perspective. Passenger Rail Investment and Improvement Act of 2008

Download Presentation

Kevin Kesler Equipment & Operating Practices Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRIIA Section 305 Next Generation Passenger EquipmentTechnical Challenges and Opportunities FRA Railroad Development Perspective Kevin Kesler Equipment & Operating Practices Division FRA Presentation to PRIIA 305 Tech Subc22 Apri 2010

  2. PRIIA 305FRA Railroad Development Perspective • Passenger Rail Investment and Improvement Act of 2008 “Amtrak is tasked with establishing a Next Generation Corridor Equipment Pool Committee to design, develop specifications for, and procure Standardized next-generation rail passenger equipment”- From FRA Summary of Public Law 110-432- Division B TITLE III—INTERCITY PASSENGER RAIL POLICY • Executive Committee, Finance and Technical Subcommittees have been established • Technical Working groups for major systems/components established

  3. PRIIA 305FRA Railroad Development Perspective • Freight Equipment Standards have contained costs and improved performance • Lack of standards in the rail transit industry have contributed to performance issues, high inventory/maintenance costs and safety concerns • US DOT Goals for Committee • Contribute to Improved Passenger Rail Service • Establish a standard fleet up to 125 mph • Reduce lifecycle costs / Improve performance • Re-establish US Passenger Rail Equipment Industry • Provide Specifications in a timely manner to support procurements

  4. PRIIA 305FRA Railroad Development Perspective • FRA/USDOT Recommendations to PRIIA 305 Committee • Design Standards are recommended where appropriate. • Interoperability is essential • Buy America– By law, DOT Secretary may issue waiver if no domestic source exists, no waivers are planned • Equipment standards should incorporate safety and performance elements which are products of the FRA R&D program, particularly those which are likely to become FRA Safety Standards (i.e.- Crashworthiness and CEM)

  5. PRIIA 305FRA Railroad Development Perspective Suggested Technical Committee Approach • Capture/Document known Requirements (universal and unique) • Identify Existing Specification Resources (Proprietary and Non-Proprietary). • Catalog Specs– Design, Interoperability, Interface, Functional • Draw from existing resources as much as possible to develop initial draft spec • Seek recommended designs from Carbuilders, Consultants, State DOT’s, etc. • Based on proven performance / life cycle cost • Seek proposed commercial terms for use of proprietary designs, if selected • Develop recommendations for consideration by Executive Committee

  6. PRIIA 305 FRA Railroad Development Perspective • Alternative approaches for design IP acquisition • Design already in public domain • Develop new designs • Purchase IP rights outright • Tie acquisition of IP rights to equipment purchases • Ask bidders to include in their proposals – • Why their design should be selected as the basis of a standard based on initial cost, life cycle cost, and performance experience. • Under what terms would the bidder be willing to allow their designs to become part of, or the foundation for, an open standard?

  7. PRIIA 305 FRA Railroad Development Perspective Thank you ! Questions / Comments ? Kevin Kesler Chief – Equipment and Operating Practices R&D