An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation to the Wyoming Pipeline Authority October 24, 2006 Casper, WY Pipeline options for Canadian crude oil to the US Gulf Coast

  2. Forward Looking Statements Certain information provided in this presentation constitutes forward-looking statements. The words "anticipate", "expect", "project" and similar expressions are intended to identify such forward looking statements. Although Enbridge believes that these statements are based on information and assumptions which are current, reasonable and complete, these statements are necessarily subject to a variety of risks and uncertainties pertaining to operating performance, regulatory parameters, economic conditions and commodity prices. You can find a discussion of those risks and uncertainties in our SEC filings. While Enbridge makes these forward-looking statements in good faith, should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary significantly from those expected. Enbridge assumes no obligation to publicly update or revise any forward looking statements made herein or otherwise, whether as a result of new information, future events or otherwise.

  3. Agenda • Rocky Mountain Issues • Expected growth from the WCSB • Enbridge pipeline transportation solutions • Spearhead Pipeline • Southern Access • Alberta Clipper • Gateway • US Gulf Coast

  4. Rocky Mountain Region Issues & Solutions • Guernsey, Wyoming hub has been oversupplied • Canadian production and Williston Basin production in Montana and North Dakota has increased dramatically • Oversupply has led to increased demand for transportation into other markets • Portions of the Enbridge North Dakota system have been prorated • Enbridge North Dakota has implemented Capacity Initiatives and Mainline Segment Expansions

  5. Supply Growth and Transportation Solutions • Expected growth from the WCSB: • Current production 2.4 MMbpd • 3.0 MMbpd by 2010, an increase of 25% • 4.0 MMbpd by 2015, an increase of 67% • Enbridge pipeline transportation solutions • Spearhead Pipeline • Southern Access Expansion • Southern Access Extension • Alberta Clipper • Access to new markets for WCSB production will be required. • Target: US Gulf Coast

  6. Alberta Clipper and Southern Access Capacity Expansions • System capacity expansions to improve access from Hardisty • Southern Access Expansion – Approved & under construction • Southern Access Extension – Regulatory Application filed, pending approval • Alberta Clipper – Commercial Concept, Regulatory Application to be filed Q1 2007

  7. Gateway • Oil pipeline 525 kbpd capacity 725 miles of 36” pipe • Condensate pipeline 193 kbpd capacity 725 miles of 20” pipe • Mainline Terminal 5.5 MM bbl tankage (oil) 1.5 MM bbl tankage (Condensate) 2 tanker berths • Finalizing Anchor Shippers Q4 2006 Regulatory filing pending commercial certainty

  8. USGC Access USGC Proposed Pipeline Options: • Flanagan to Houston • Patoka to Beaumont • Patoka to St. James • Hardisty to Houston Proposed options are all greenfield projects which Enbridge can develop independently and in a timely manner. Other options are being considered (i.e. utilizing existing pipelines owned by others) but are not addressed in this presentation.

  9. USGC Map Key Points: • Gulf Coast, largest US refining area • Viable destination for Oilsands growth • Options 1-3 efficiently build upon proposed Clipper & S.A. projects 4 1 2 3

  10. USGC Summary of Options * Tolls include power * Capacity 400 kbpd

  11. USGC Access Considerations as it Affects Wyoming • Wyoming support may help accelerate ROW access in certain areas • Intermediate receipt or delivery points in Wyoming need to be examined • Access to Wyoming refineries • Pipeline operations, crude quality, tankage

  12. USGC Access Next Steps • Continue to define project scope through ongoing dialogue with interested shippers • Run further toll analysis as project scope and cost estimates are better defined • Continue to examine alternative options • Finalize scope: Q4/2006 • Open Season: Q1/2007 • Execute agreements: Q2/2007

  13. Presentation to the Wyoming Pipeline Authority October 24, 2006 Casper, WY Pipeline options for Canadian crude oil to the US Gulf Coast

  14. Historical & Forecast SupplyMarket Unconstrained Case 2006 Survey Potential 2006 CAPP Forecast 2006 NEB Forecast Forecast Historical 2006 Risked Supply Raw Bitumen Synthetic Light Synthetic Heavy Conventional Heavy Pentanes Plus Conventional Light