Contradictions
This presentation is the property of its rightful owner.
Sponsored Links
1 / 6

Contradictions PowerPoint PPT Presentation


  • 94 Views
  • Uploaded on
  • Presentation posted in: General

Contradictions. Pile Driving. Y = Driving Speed What are the Knobs?. Driving Speed = f ( Ground Hardness, Pile Diameter, Tip Angle …). Driving Speed is Slow. Ground is Hard. Pile Diameter is Large. Tip Shape is Blunt. Tip Shape is Sharp. Support is Poor. Contradiction. Pile Driving.

Download Presentation

Contradictions

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Contradictions

Contradictions


Contradictions

Pile Driving

Y = Driving Speed

What are the Knobs?

Driving Speed = f ( Ground Hardness, Pile Diameter, Tip Angle …)


Contradictions

Driving Speed is Slow

Ground is Hard

Pile Diameter is Large

Tip Shape is Blunt

Tip Shape is Sharp

Support is Poor

Contradiction

Pile Driving

Thin

Thick

Use a knob and a setting

Pile Diameter


Contradictions

Pile Driving

In order to drive fast, the pile must be sharp. In order to support heavy loads, the pile must be blunt


Contradictions

Conflicting Requirements

Supporting

Driving

Sharpness

Compromise Solutions

Time Consuming

Guarantees Risk

Delays the Solution


Contradictions

Idealized Solutions

Conflicting Requirements

Supporting

Driving

Blunt

Sharp

It must be sharp and blunt


  • Login