Denver’s Peak Academy

Denver’s Peak Academy. Black Belt Training Day 3 – Tools to Eliminate Waste. Agenda – Day 3: Tools to Eliminate Waste. P eak Academy. A3 Boxes 4-9. The A3 Model. Planning. 1. Why Change is Needed . 2. Current State. Future State. 3. Innovation. Gap Analysis / Assumptions. 4.

scout
Download Presentation

Denver’s Peak Academy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Denver’s Peak Academy Black Belt Training Day 3 – Tools to Eliminate Waste

  2. Agenda – Day 3: Tools to Eliminate Waste

  3. Peak Academy A3 Boxes 4-9

  4. The A3 Model Planning 1 Why Change is Needed 2 Current State Future State 3 Innovation Gap Analysis / Assumptions 4 Brainstorming 5 6 Experiments Sustain the Innovation 7 Action Plan Results 8 Lessons Learned 9

  5. TITLE:_________________________________ Date Started:_______Current Date:_________ Team:___________________________ Executive Sponsor: Process Owner: 1 Why Change is Needed 4 Gap Analysis / Assumptions 7 Action Plan • Sample Questions • Why are we doing this? • What is the burning platform? • What is the chief complaint? • What is the impact of this issue? • Intent of the action • Scope – Start & end points • What holds us back from the Future State? • What are the root causes of these road blocks? • Use Tools to ID Waste 2 Current State 5 Brainstorming 8 Results Describe attributes of the current state – Quantitative & Qualitative Graphically present picture of Current State 3 Future State 9 Lessons Learned 6 Experiments • Describe attributes of the future/goal state – Quantitative & Qualitative • Graphically present picture of Future State • Are metrics defined and achievable? • METRICS: Hard-$ savings, Soft-$ savings, Service Level Improvement, and Human Development

  6. Building box 4 of the a3 What holds us back from the Future State? What are the root causes of these road blocks? Use Tools to ID Waste • Building on your A3 from yesterday, complete Box 4 addressing the questions above. • You will have 15 minutes to work on Box 4 and then we will share as a class. 4 Gap Analysis/Assumptions

  7. Peak Academy Continuous Flow

  8. Paperwork Game • The objective of your group is to complete all 6 pieces of paperwork as quickly and accurately (# rework) as possible • Groups will be split by batch size: • One group works in batches of 6 (each person completes their step for all sheets before passing) • Another group does one sheet at a time • Other groups will work in batches of 2 or 3 (each person completes their step for 2 or 3 sheets before passing)

  9. 3 2 6 2 2 4 2 3 + 2 + 6 + 2 + 2 = 15 √ 3 + 2 + 6 + 2 + 2 = 15 15 + 4 + 2 = 21 √ 3 + 2 + 6 + 2 + 2 = 15 √ 15 + 4 + 2 = 21 15 + 4 + 2 = 21 √

  10. Batching vs. One-piece flow Batching: • Completing multiple units of work before moving it on to the next step One-Piece Flow: • Completing a single unit of work before moving it on to the next step Ortho Clinical Diagnostics Jan ‘08

  11. Batching vs. One-Piece flow Example: DHS

  12. WIP: Work in Progress • WIP is any work in a process that is waiting to be completed • WIP requires storage for the material or information, and can have negative impacts on productivity, quality, and customer satisfaction • Examples: • Piles of applications in inboxes • Clients waiting to be called for the next step • Groceries at a checkout counter

  13. Rework- the “Hidden Factory” http://nayariniestiningsih.blogspot.com/

  14. Rolling First-time Yield • Percent Complete & Accurate: • Percent of occurrences where a process step is completed without needing corrections or requesting missing information • Rolling First-Time Yield: • Percent of occurrences where the entire process is completed without needing to be fixed or rehandled in some way • This is the product of the Percent Complete and Accurate for each process step, expressed as a percentage • Example: Processing Claims ### claims done with no rework 1,000 claims 90% 90% 90% 90% 90%

  15. BREAK • Let’s take a short break and jump back in with other Lean tools: • Visual Management systems • 6-S

  16. Peak Academy Tools to Eliminate Waste (A3 – Boxes 5 & 6) Visual Mgmt Systems & 6-S

  17. Tools to Eliminate Waste: Visual Management SystemsFor more information, see BMGI Course: Visual Management • Visual Management Systems • Production Boards • Kanban • Andon • Some Potential Benefits • Show productivity in “real time” • Provides Transparency to the Process • Good for Customer Service Improvement • Increases “Flow” in a process

  18. Production Boards Budget Board at the BMO

  19. Production Boards Peak Academy work management and Gemba Walk boards DOF DECC fundraising

  20. Production Boards • Production Boards at Denver Water: • Top boards show daily service issues & status • Bottom right board shows total cost for eVoucher Invoices

  21. Billboard • Japanese Term for “billboard” – “kanban” • Creates PULL in a process flow to reduce Lead Times & Inventory • Only proceed in a process when Kanban is shown Kanban – Easy to see when levels are low. Only then re-stock

  22. Lantern • Japanese term for “lantern” – “andon” • Used to alert team or management about issues (or opportunities) • Opportunity for experts (those that “do” the process) to make change

  23. Visual Management Systems: Exercise • Individually, create a production board for one of your innovations. (15 mins) Choose a process that occurs in your work-place Create a Production Board that may be applicable to your work Try to only use the materials in the room. • Present your Production Board to the person next to you. After 5 minutes. Switch and let them tell you about their production board. (10mins) • Facilitator will ask for a few to discuss with the group. (25 mins) • Question: • Could the creation of a Production Board be a “Just Do It” after you’re done with Black Belt training?

  24. 6-S: Game The 6S numbers game…

  25. 6-S: The “WHY” of 6SFor more information, see BMGI Course: 5S 6-S is a Lean tool to eliminate waste that: • Is used for improving organization of the workplace • Reduces waste associated with searching for supplies, tools, and information • Increases morale, safety & quality • Makes problems more visible

  26. 6-S: What is a 6S? Safety

  27. 6-S: A Basic Cornerstone of Lean • Supports other elements of Lean • 6S is a ‘basic enabler’ for developing a culture of continuous improvement 27

  28. 6-S: Sort • Separate unnecessary from the necessary • Remove things not required for the process • Add things that are missing • Discard junk • Red Tag items • For follow-up, evaluate and decide • Item is needed = keep it • Item not needed = discard it!

  29. 6-S: Set in Order • Provide the needed tools at each workstation • Organize everything so it is convenient to complete the work • Standardize workstations where similar work is done • Centrally locate shared items so they are convenient for everyone who uses them • Move items out of drawers and into the open so they easy to retrieve • Label everything!

  30. 6S: Shine • Clean all work surfaces, under & behind all equipment • Label and outline all locations • Re-paint to make everything look new • Goal: create a visual workplace

  31. 6-S: STANDARDIZE • Maintain adherence to the first three S’s • Develop task sheet for each 6S’d location • Assign owner to each of task sheet • Develop 6S scoring method

  32. 6-S: Sustain • Schedule periodic audits to score 6-S by area • Display results – 6-S Scorecard • Allocate time periodically to continue up-keep: • Sort • Set in Order • Shine • Standardize • Safety

  33. 6-S: SAFETY • Be on lookout for safety issues & resolve • Employee Safety • Ergonomic Issues • Ensure safety equipment is operational • Enter work orders for safety issues that cannot be resolved in the 6-S activity 33

  34. 6S: Tips • Scope 6S areas small (workstation or copy room vs dept) • More 6S activities are better than 1 large activity • Have enough time available for a thorough Sort • Do a little pre-work (Create 6S worksheets, etc.) • Size team to match the area • Include people on team from outside the area • They will ask “Why do you have the space set up this way”? • No need for perfection on 1st 6S pass – plan on multiple passes • Don’t clean up the area before the 6S – the worse the before, the better the after • Email and/or print-out (display) before and after pics!

  35. 6-S Example: Common Areas in an Office After 6-S Before 6-S “Out of clutter, find simplicity, from discord, find Harmony. In the middle of difficulty lies opportunity.” - Albert Einstein -

  36. LUNCH BREAK • Let’s take a break and pick back up with other tools to eliminate waste: • Standard work & mistake-proofing • Types of innovation events

  37. Tools to Eliminate Waste Standard Work A3 Boxes 5-6

  38. Standard Work – Make a Dog face (1st Round) • Make a dog face using the square sheet of paper provided • Your dog does not have to look like this one: • When you’re done, share it with the class!

  39. Standard Work – Make a Dog Face (2nd Round) • Now – let’s see what the customer really wanted: • Instructions • Make the dog face again on a new sheet of paper • Discussion: How did it go this time?

  40. Standard Work – Make a Dog Face (3rd Round) • Make a dog face using the picture provided on another sheet of paper AND the instructions

  41. Tools to Eliminate Waste – Standard WorkFor more information, see BMGI Course: Standard Work Standard Work: • Create standard procedures & documentation that will… • Mature your process & sustain innovation • Help train team members • This can be as simple as a “Process/Procedure Document” Improve Org Service Delivery! Standard Work State before Innovation RIE / Innovation

  42. Standard Work – Discussion • Lean concepts at work here: • The customer defines value – always start w/ what they value • Standard Work eliminates waste and errors Deliver value to customers without waste (wasted paper!) Make your standard work visual when possible

  43. Standard Work – examples • Animal Care Control Administrative Citation:

  44. Standard Work – examples • Animal Care Control Adoption Notice:

  45. Standard Work – examples • Denver Human Services – Child Support:

  46. Standard work in your workplace • Form a group of 2-3 people and design Standard Work for one of your work processes. • As a team, come up with a visual check list to maintain and adhere to a standard. Use one of your innovations and as a team come up with standard work for that innovation. You will have 20 minutes: • Spend about 5 minutes brainstorming ideas with your group • Spend the remaining 15 minutes creating the Standard Work as a group. • Share your Standard Work with the class • Is this something you would consider implementing as an innovation after class? • Were you able to get ideas from your classmates?

  47. Tools to Eliminate Waste: Mistake-proofing • Also known as poka yoke - pronounced “poh-kah yoh-keh” • Error-proofing • Some benefits: • Reduced re-work • Reduced defects • Increases safety • Increase ROI – less re-work!

  48. Mistake-proofing examples Drop-down menus prevent incorrect inputs Auto-fill reduces inputting errors Required fields prevent missing data Outlook warns users of a potential oversight

  49. Mistake Proof Exercise How do you make a process step mistake proof? Ideas: • Templates— • Do we ask for a print out only to hand it back to the customer after we read it? Is it possible to read it on an Iphone? • Carpenters use jigs or patterns—does your process lend itself to a pattern or jig? • A jig is a type of custom-made tool used to control the location and/or motion of another tool. A jig's primary purpose is to provide repeatability, accuracy, and interchangeability in the manufacturing of products. Spend the next 15 mins work on your A3 Innovations: In box 5 and 6 write what type of steps you can mistake proof on your innovations. Discuss them with your neighbor.

  50. Peak Academy RIE Example