1 / 18

General Purpose Worklist

General Purpose Worklist. Performing Application. Workflow. Host. Archive. Manager. Store SOP Instances. Initiate creation of GPSPS (N-CREATE). Transmit SOP. Instances for Input. Receive GPSPS. Query GPSPS. and Relevant. Information. Update GPSPS. (IN PROGRESS). Create GPPPS.

sandra-neal
Download Presentation

General Purpose Worklist

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Purpose Worklist

  2. PerformingApplication Workflow Host Archive Manager Store SOP Instances Initiate creation of GPSPS(N-CREATE) Transmit SOP Instances for Input Receive GPSPS Query GPSPS and Relevant Information Update GPSPS (IN PROGRESS) Create GPPPS (IN PROGRESS) Request Calculation Status Set GPPPS (COMPLETED) Update GPSPS (COMPLETED) Store Results General Purpose Worklist (RT)

  3. PerformingApplication Workflow Host Archive Manager Store SOP Instances Initiate creation of GPSPS(N-CREATE) Transmit SOP Instances for Input Receive GPSPS and Relevant Information Update GPSPS (IN PROGRESS) Create GPPPS (IN PROGRESS) Request Calculation Status Set GPPPS (COMPLETED) Update GPSPS (COMPLETED) Store Results Required Extensions Query GPSPS

  4. Scenarios: Host requests... • Segmentation • Treatment planning • Dose calculation • Treatment plan evaluation • Treatment • Port film

  5. Scenarios – Object References

  6. Scenarios – Segmentation Request Segmentation SS exists N Y CT CT, SS Create SS Create SS ‘ C-STORE

  7. New segmentation Existing segmentation Continue segmentation Modify segmentation Parameters List of organs List of colors Margins Scenarios – Segmentation

  8. Scenarios – Treatment Planning Request Treatm. Plang. Plan exists N Y CT, SS, PRE New Version N Y CT, SS, PRE, RTP CT, SS, RI, PRE, RTP Create RTP, RI Create RTP 2, RI Create RTP ‘, RI C-STORE

  9. New treatment plan Existing treatment plan New version Competing plan Parameters Technique Number of beams Treatment unit Scenarios – Treatment Planning

  10. Scenarios – Dose Calculation Request Dose Calc. Dose exists N Y CT, SS, CAL, RTP CT, SS, DOS CAL, RTP Create DOS Create DOS ‘ C-STORE

  11. New dose calculation Existing dose calculation Correct for treatment errors Accumulate previous dose Parameters Algorithm Dose grid Inhomogeneity correction Physical constraints Biological constraints Scenarios – Dose Calculation

  12. Scenarios – Plan Evalutation Request Plan Eval. CT, RI, SS, DOS, RTP Create RTP ‘ C-STORE

  13. Approve treatment plan Parameters Scenarios – Plan Evalutation

  14. Scenarios – Treatment Request Treatment Interrupt before N Y RTP, RI, BM, BR, SE Comp. N Y RTP, RI, BM, BR, SE RTP, RI, BM, BR, SE Create BM, BR, SE Create BM, BR, SE Create BM, BR, SE C-STORE

  15. Normal treatment Treatment interrupt before Compensate Patient setup correction Parameters Scenarios – Treatment

  16. Scenarios – Port Film Request Port Film RTP, RI, BM, BR Create RI C-STORE

  17. Take port film Parameters Beam related With dose accumulation Before / after treatment Single / double exposure Scenarios – Port Film

  18. Segmentation List of organs List of colors Margins Treatment planning Technique Number of beams Treatment unit Dose calculation Algorithm Dose grid Inhomogeneity correction Physical constraints Biological constraints Port film Beam related With dose accumulation Before / after treatment Single / double exposure Required Parameters

More Related