What I have done in last 2 weeks

What I have done in last 2 weeks. Read few papers and books for corrections in chapter # 1 Corrections in chapter # 1 Benchmark calculations for kicks using Bane & Gluckstern paper Some reading on CLIC for writing chapter # 2

Download Presentation

What I have done in last 2 weeks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What I have done in last 2 weeks • Read few papers and books for corrections in chapter # 1 • Corrections in chapter # 1 • Benchmark calculations for kicks using Bane & Gluckstern paper • Some reading on CLIC for writing chapter # 2 • Booked my (2nd ) visa appointment with Swiss embassy and is on 25th Sept. • Need an invitation letter from CERN. • Had lots of domestic issues!!! Vasim Khan MEW group meeting slide 1/5 Thu: 10/10/09

  2. Kick factor calculation HFSS v 11 D C E E C D Vasim Khan MEW group meeting slide 2/5 Thu: 10/10/09

  3. Monopole Neg. sign Pos. sign C C D D E E Vasim Khan MEW group meeting slide 3/5 Thu: 10/10/09

  4. Conclusion ?? • It seems neg. sign is correct.....but still some doubts! • For CLIC_DDS1 structure neg. sign works well except for cell # 1 (a=4.0mm) kick. Next ? • Some simulations on DDS1 structure to validate the prediction of the fits. • What is our goal for the CLIC workshop ? • Begin writing chapter # 2 : CLIC an overview. • CLIC crab cavity? Vasim Khan MEW group meeting slide 4/5 Thu: 10/10/09

  5. Chapters planned • 6. Designing a structure • a. Optimisation procedure • i. Beam dynamics constraints • ii. RF breakdown constraints • b. Prescribing a Gaussian distribution • c. Interleaving structures • d. Efficiency calculations • 7. Results • a. 3.3 GHz structure • b. 1.0 GHz structure • c. 2.3 GHz structure • 8. Conclusion • 1. Introduction • 2. CLIC an overview • 3. RF parameters • 4. Wakefield • a. Theory • b. Methods of wakefield suppression • i. Waveguide damping • ii. Choke-mode damping • iii. Detuning and moderate damping • 5. Circuit model • a. Single band • b. Double band • c. Double band with manifold* • d. Spectral function* * I need some understanding. Vasim Khan MEW group meeting slide 5/5 Thu: 10/10/09