Online Hotel Reservation System

Online Hotel Reservation System . MSE Presentation 2 Cem Oguzhan February 21, 2005. Outline . Project Overview Action Items Project Plan Architecture Design Formal Specification Formal Inspection Check List Test Plan Questions Demo (Hotel Reservation System). Project Overview.

salena
Download Presentation

Online Hotel Reservation System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Online Hotel Reservation System MSE Presentation 2 Cem Oguzhan February 21, 2005

  2. Outline • Project Overview • Action Items • Project Plan • Architecture Design • Formal Specification • Formal Inspection Check List • Test Plan • Questions • Demo (Hotel Reservation System)

  3. Project Overview • Project Statement • To provide a web site that can allow a user to search and reserve a hotel room or cancel his/her reservation over the internet at any time. • Action Items from the last presentation. • Users can reserve up to three rooms with their own room preferences at the time. • Dynamic price search for rooms. • Travel agents can request an account to be a member to the HRS.

  4. Project Plan – Cost Estimate • Current Progress • 232 total hours (Phase 1 & Phase 2) • 77 hours research • 78 hours documentation • 21 hours design • 56 hours coding • 800 SLOC • 25% of implemented features • 6 Documents

  5. Project Plan – Cost Estimate • Productivity • 800 SLOC / 56 hours = 14.2 SLOC/hour • 6 Documents / 78 hours = 0.07 Docs/hour • Remaining Work • 800 SLOC / 0.25 = 3200 SLOC (estimated total) • 4-5 Documents

  6. Project Plan – Cost Estimate • Remaining Effort • 2400 SLOC / (14.2 SLOC/hour) • = 169 hours or 25 days (7 hours per day) • 72 hours for documentation • = 11 days

  7. Project Plan – WBS • High Level • Coding/debugging – 25 days • Testing – 7 days • Documentation – 11 days

  8. Project Plan -WBS • Deliverables for Presentation 3 • Action Items (documentation) • User Manual (documentation) • Component Design (documentation) • Assessment Evaluation (testing) • Project Evaluation (documentation) • References (documentation) • Technical Inspection Letters (documentation)

  9. Project Plan • Development (2/22 – 3/31) • Testing (4/1 – 4/11) • Documentation (4/12 – 4/29)

  10. Architecture Design • The architecture of the HRS is based on 3-tier architecture. There are three logical tiers: • the presentation tier. • the middle tier. • the data tier.

  11. Architecture Design • The diagram shows 3-tier type of architecture.

  12. Architecture Design – Presentation Tier • The presentation-tier for the Hotel Reservation System is ASP.NET Web Forms with User Controls. • Detail of the Presentation Tier

  13. Architecture Design – Presentation Tier

  14. Architecture Design – Presentation Tier

  15. Architecture Design – Presentation Tier

  16. Architecture Design – Middle Tier The class diagram above captures middle-tier, business specific layer, of the Hotel Reservation System.

  17. Architecture Design - Login

  18. Architecture Design – Making a Reservation Detail View

  19. Architecture Design – Canceling a Reservation

  20. Architecture Design - Requesting an Account

  21. Architecture Design –Generating a Report

  22. Architecture Design – Adding an Hotel

  23. Architecture Design – Data Tier

  24. Architecture Design • Error Handling The full stack trace and requested URL that generated the error is written to the Application Event Log on Internet Information Services (IIS) server • Security The Hotel Reservation System uses ASP.NET Forms Authenticationto validate users.

  25. Formal Specification --Custumer and TravelAgent have unique user name context User inv uniqueUserName: User.allInstances->forAll(u1,u2 | u1<>u2 implies u1.userName<>u2.userName) --Each reservation belongs to one hotel Enforce by the multiplicity of association HotelReservation --Each reservation allocates one room Enforce by the multiplicity of association ReservationRoom

  26. Formal Specification --check in date can not be later than check out date context r:Reservation inv checkInNotBeLaterCheckOut: r.checkIn<r.checkOut --room can’t be overbook context Reservation inv overBookRoom: Reservation.allInstances->forAll(r1, r2 | r1.reservationNumber <> r2.reservationNumber and r1.allocation.roomNumber = r2.allocation.roomNumber implies r1.checkOut <= r2.checkIn or r2.checkOut <= r1.checkIn)

  27. Formal Specification -- A hotel can never have more reservations for a date than rooms context Hotel inv notOverBook: Date.allInstances->forAll(d|Hotel.allInstances-> forAll(h| h.theReservation-> select(h.theReservation.dates->includes(d))-> size <= h.theRoom->size ) ) -- each hotel is located at one city and state context Hotel inv oneLocation: Hotel.allInstances->forAll(h1,h2 | h1 = h2 implies h1.city = h2.city and h1.state = h2.state) --hotel star rating should be between 1-5 context Hotel inv starRating: Hotel.allInstances->forAll(h | h.rating >0 and h.rating < 6)

  28. Formal Specification verifyLogin(userName:String,password:String):Boolean =User.allInstances-> exists(u:User | u.userName = userName and u.password = password) -- update the customer account context Customer::updateAccount(userName:String,email:String,password:String,firstName:String,lastName:String,cardType:String,cardNumber:Integer,experationDate:Integer,phone:String,address:String,city:String,state:String,zip:String):Boolean --the customer should be exist and login pre:verifyLogin(userName,password) --the customer's userName can not be updated and userName of old customers’ record are not changed post:Customer.allInstances.userName = Customer.allInstances.userName@pre post:Customer.allInstances->select(c:Customer | c.userName <>userName)->forAll(c:Customer | c.email = c.email@pre and c.password = c.password@pre and c.firstName = c.firstName@pre and c.lastName = c.lastName@pre and c.cardType = c.cardType@pre and c.cardNumber = c.cardNumber@pre and c.experationDate = c.experationDate@pre and c.phone = c.phone@pre and c.address = c.address@pre and c.city = c.city@pre and c.state = c.state@pre and c.zip = c.zip@pre) --only the customer's information is updated post:Customer.allInstances->select(c:Customer |c.userName = userName)->forAll( c:Customer | c.email = email and c.password = password and c.firstName = firstName and c.lastName = lastName and c.cardType = cardType and c.cardNumber = cardNumber and c.experationDate = experationDate and c.phone = phone and c.address = address and c.city = city and c.state = state and c.zip = zip)

  29. Formal Specification --add new hotel context Hotel::newHotel(hotelID:String, name:String,address:String, city:String, state:String, phone:String, rating:Integer):Boolean --pre: the admin is logined --the hotel is not exist pre:Hotel.allInstances->forAll(h:Hotel | h.hotelID <> hotelID) --existing hotels record are not changed only a new hotel is added post:Hotel.allInstances.hotelID = Hotel.allInstances.hotelID@pre-> including(hotelID) post:Hotel.allInstances.name = Hotel.allInstances.name@pre->including(name) post:Hotel.allInstances.address = Hotel.allInstances.address@pre-> including(address) post:Hotel.allInstances.city = Hotel.allInstances.city@pre->including(city) post:Hotel.allInstances.state = Hotel.allInstances.name@pre->including(state) post:Hotel.allInstances.phone = Hotel.allInstances.name@pre->including(phone) post:Hotel.allInstances.rating = Hotel.allInstances.rating@pre->including(rating)

  30. Formal Specification --make a reservation context Reservation::makeReservation(r:Reservation) --pre:r.theUser.verifyLogin(r.theUser.userName,r.theUser.password) --pre: Reservation.allInstances->excludes(r) --post:Reservation.allInstances.reservationNumber = Reservation.allInstances.reservationNumber@pre-> including(r.reservationNumber)

  31. Formal Inspection Check List • The documentation follows MSE portfolio standard which is describe at http://www.cis.ksu.edu/~sdeloach/mse/portfolio.htm • Every requirement has only one clear interpretation. • The requirements of the system are consistent . • The architecture of the system is sufficiently clear from the documents and diagrams. • The architecture design implements all specification and requirements. • The symbols used in the class diagrams conform to the UML standards. • The symbols used in the sequence diagrams conform to the UML standards. • The class diagrams have a corresponding description provide in the architectural design document. • The descriptions of all class diagrams are clear and make sense. • All classes in the HRS are found in the USE model. • The role names and multiplicities in the USE model match correctly to UML diagrams of the HRS. • The operations in the USE model match with the methods of the corresponding class diagrams of the HRS.

  32. Test Plan • Unit Testing with TestSharp2004 • Performance Testing with JMeter

  33. Test Plan – test cases • Search a room • Login • Crate a new customer account • Apply for an account • Generate a report • Cancel a reservation • Add/Update a Hotel • Add/Update a Room • Approve/Disapprove travel agent account

  34. Questions