PCB production. Next steps. MMSW. PCBs (1.2 x 0.5 m 2 ) were ordered at Eltos Delivery confirmed for middle of next week (from Eltos ) Foils with resistive strips 8 foils with sputtering have been delivered by A. Ochi

Download Presentation

PCB production

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Pcb production

PCB production

Next steps

J. Wotschack


Pcb production

MMSW

  • PCBs (1.2 x 0.5 m2) were ordered at Eltos

    • Delivery confirmed for middle of next week (from Eltos)

  • Foils with resistive strips

    • 8 foils with sputtering have been delivered by A. Ochi

    • 8 foils with strips by screen printing to be done at Charbonney (Meyrin)

    • Will try to measure all foils before glueing

  • Glueing of resistive foils to PCBs to be done at CERN

  • Pillar deposition at CERN

  • Hope to have first set of completed PCBs ready end of November/begin December

  • Panel glueing: safer to plan for beginning of January

J. Wotschack


Nsw mms

NSW MMs

Next step: test the glueing procedures and pillar deposition for large-size PCBs (2.3 x 0.5 m2).No need to make operational boards, processes can be tested with dummy boards and foils (saves cost & time)

  • Material procurement

    • PCBs: MDT (Italy); Elvia; Eltos; Triangle Lab; others

    • Kapton foils (procurement either through CERN or companies)

  • Glueing

    • MDT (Italy) + others (?) – Large press

    • Elvia (France) + others (?) – Autoclave

    • Triangle Lab ?

  • Pillar deposition

    • Eltos;Elvia; Triangle lab; others ?

  • CERN (Rui de Oliveira) will prepare specifications

  • Schedule: expect results by end of January (?)

  • Questions:

    • who is interested to be involved (Saclay, Frascati, others ?)

    • How to finance this step (moderate costs)?

J. Wotschack