Role of Account Management at ERCOT. IDR Protocol Requirement for True-Up Settlement COPS September 27, 2005. Background. Section 9.2.6 specifies IDR data completeness levels required for True-Up Settlements: 99% ERCOT-wide 90% per MRE

Download Presentation

Role of Account Management at ERCOT

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Role of account management at ercot

Role of Account Management at ERCOT

IDR Protocol Requirement for True-Up Settlement

COPS

September 27, 2005


Background

Background

  • Section 9.2.6 specifies IDR data completeness levels required for True-Up Settlements:

    • 99% ERCOT-wide

    • 90% per MRE

  • Protocol requirement was put in place during 2002 when IDR data loading was poor

  • Currently the IDR data completeness levels are consistently above 99% ERCOT-wide

  • Issue:

    • Several MREs have few IDR ESIIDs

    • Missing data on a single ESIID can cause these MREs to miss their 90% target

    • This situation has occurred on multiple occasions

    • Can result in True-Up settlements being delayed


Idr esiid counts by mre

IDR ESIID Counts by MRE


Suggested protocol language change

Suggested Protocol Language Change

9.2.6True-Up Statement

ERCOT will use all available settlement data, as described in Section 9.2, Settlement Statements to produce the True-Up Statement for each Statement Recipient for each given Operating Day.

True-Up Statements will be issued six (6) months following the Operating Day providing at least that ERCOT has received and validated at least ninety-nine percent (99%) of the total IDR data and that ERCOT has received and validated at least ninety percent (90%) of the IDR data from each Meter Reading Entity (MRE) with at least 20 IDR ESIIDs. If the above conditions have not been met, True-Up Statements will be issued as soon as the IDR data becomes available. If no True-Up Statement has been issued twelve (12) months after the operating day, a True-Up Statement will be issued. In the event that any True-Up settlement date does not fall on a Business Day, then the True-Up Statement will be issued on the following Business Day.