Engineering & Construction Management Department. January Report, 2012. EPIA Medians Cottonwoods/Global Reach Landscape.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Page 1 of 1' - sailor


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Engineering & Construction Management Department

JanuaryReport, 2012

EPIA Medians Cottonwoods/Global Reach Landscape

General Project Description: The project will consist of enhancing the appearance of the roadway medians on Global Reach between Montana and George Perry as well as landscaping on Cottonwoods Drive.

Construction Activities:

  • Walk-thru’s are being conducted and punch lists are being generated and issued per walk-thru.

Cottonwoods

Global Reach

PROJECT SCHEDULE

Page 1 of 1

slide2

Engineering & Construction Management Department

JanuaryReport, 2012

EPIA Medians Cottonwoods/Global Reach Landscape

General Project Description: The project will consist of enhancing the appearance of the roadway medians on Global Reach between Montana and George Perry as well as landscaping on Cottonwoods Drive.

Overall Project Budget (includes approved project development, design and construction costs): $2,200,000.00

Funding Source(s): Airport Enterprise Fund

PROJECT SCHEDULE

Project Contact

Project Manager: Victoria Ruiz

541-4357

Design Consultant: Sites Southwest

Construction Contractor: Three C’s Construction

Page 1 of 1