Slideshow about Key requirements Compliance with NRSWA regulations and time...


Download Presentation

Key requirements Compliance with NRSWA regulations and timescales Centralisation and greater control of information A

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use only and may not be sold or licensed nor shared on other sites. SlideServe reserves the right to change this policy at anytime.While downloading, If for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.











- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -




Presentation Transcript


  • Key requirements

  • Compliance with NRSWA regulations and timescales

  • Centralisation and greater control of information

  • Adherence to correct protocol and procedures by users on site

  • Increased productivity

  • Reduced liability


Form layout and structure


System output


Website – Search & View Job Records


Website – Review & Manage Job Records


Website – Review Job Information


Website – Review Job Location


Website – Review Photos


Website – Export Data To Excel


Website – management information statistics

1. Productivity by engineer


Website – management information statistics

2. Completed reinstatements by material type


Website – management information statistics

3. Material usage by engineer


Website – management information statistics

4. Reinstatement by road type


Meeting the key requirements

  • Compliance with NRSWA regulations and timescales

    • Completed information is received by the system in approximately 2-3 minutes

    • All required information is captured

    • Instant email notifications provide alerts to key personnel


Meeting the key requirements

  • Centralisation and greater control of information

    • The website provides a central store for all system information

    • It is accessible 24/7 from any Internet connection

    • Provides highly visible, easily accessible information to the business as a whole


Meeting the key requirements

  • Adherence to correct protocol and procedures by users on site

    • The underlying software rules will ensure that all information is captured accurately and in the correct format

    • The software can also force the user to enter specific details at a certain point – e.g. enter / confirm risk assessment questions before entering the main question set

    • It is not possible for critical information to be omitted or incorrectly entered


Meeting the key requirements

  • Increased productivity

    • Engineers do not need to perform administration tasks associated with submitting their reinstatement sheets

    • Users are only presented with relevant questions, dependent upon the answers given

    • Instant access to information and statistics facilitates more proactive and effective planning


Meeting the key requirements

  • Reduced liability

    • Before, after, location and site clearance photographs (date and time stamped) provide detailed evidence of site conditions

    • The system guarantees that all required information is captured prior to allowing a job to be sent

    • Instant email notifications ensure that key staff are in possession of the information they require, within moments of job completion