MUTU PROYEK SISTEM - PowerPoint PPT Presentation

Mutu proyek sistem
Download
1 / 17

  • 101 Views
  • Uploaded on
  • Presentation posted in: General

MUTU PROYEK SISTEM. SESI : 13 BY ARISM,SKOM,MMSI. Tujuan dari Matriks Software. Pengukuran yang akurat dan tepat waktu Menilai kualitas proyek secara keseluruhan Sebagai dasar untuk estimasi biaya dan jadwal penyelesaian proyek secara akurat.

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

MUTU PROYEK SISTEM

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Mutu proyek sistem

MUTU

PROYEK SISTEM

SESI : 13

BY

ARISM,SKOM,MMSI.

MANPRO-M13: MUTU PROYEK SISTEM


Tujuan dari matriks software

Tujuan dari Matriks Software

  • Pengukuran yang akurat dan tepat waktu

  • Menilai kualitas proyek secara keseluruhan

  • Sebagai dasar untuk estimasi biaya dan jadwal penyelesaian proyek secara akurat

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Sistem Perangkat Lunak SI Yang Sukses, Proses Dari Awal Sampai Proses Akhir Terdefinisi (Dibuat) Dengan Sempurna.

  • Tangguh

  • Kinerja baik

  • Selesai dengan sempurna

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Pembuatan Software Secara Modern Mencakup :

  • Perencanaan, dapat mengakomodasi kebutuhan dan arsitektur yang terus berkembang

  • Penanganan manajemen resiko, dan pengukuran progres dan kualitas secara objektif

  • Kemampuan sistem yang terus dikembangkan melalui peningkatan fungsi-fungsi

MANPRO-M13: MUTU PROYEK SISTEM


Tujuh matriks inti

Tujuh Matriks Inti

Indikator Manajemen

  • Pekerjaan dan kemajuan (kinerja)

  • Biaya dan pengeluaran

  • Penugasan dan tim dinamik (perubahan personel)

  • Indikator Kualitas

  • Perubahan kebijakan dan stabilitas

  • Kerusakan dan modularity

  • Rework dan adabtability

  • Mean time between failure(MTBF)

  •  defect rate

MANPRO-M13: MUTU PROYEK SISTEM


Iterative development pengelolaan perubahan dan mengukur perubahan

Iterative Development: Pengelolaan Perubahan Dan Mengukur Perubahan

Aspek Yang Paling Penting Dalam Matriks

MANPRO-M13: MUTU PROYEK SISTEM


Gambar iterative process

Planning and analysis

Design

Assessment

Implementation

Gambar Iterative Process

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

The phases of the life-cycle process

Engineering Stage

Production Stage

Inception

Elaboration

Construction

Transition

Idea

Architecture

Beta Release

Product

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Proses Workflow

  • Aktivitas-aktivitas dari proses pembuatan perangkat lunak dibagi kedalam 7 workflow utama sbb:

  • Management

  • Environment

  • Requirement

  • Design

  • Implementation

  • Assessment

  • Deployment

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Tujuh Level Workflow

  • Management workflow: controlling the process and ensuring win condition for all stakeholder

  • Environment workflow: automating the process and evolving the maintenance environment

  • Requirement workflow: analyzing the problem space and evolving the requirements artifacts

  • Design workflow: modeling the solution and evolving the architecture and design artifacts

  • Implementation workflow: programming the components and evolving the implementation and deployment artifacts

  • Assessment workflow: assessing the trends in process and product quality

  • Deployment workflow: transition the end products to the user

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Inception Elaboration Construction Transition

Management

Environment

Requirements

Design

Implementation

Assessment

Deployment

Actifity levels across the life-cycle phase

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Allocated

Usage scenarios

Result from the

previous iteration

  • Up-to-date risk assessment

  • Controlled baselines of artifacts

  • Demonstrable results

  • - Requirements understanding

  • - Design features/performance

  • - Plan credibility

Management

Requirements

Design

Implementation

Assessment

Deployment

Result for the

next iteration

The workflow of an iteration

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Iteration emphasis across the life cycle

Management

Requirements

Design

Implementation

Assessment

Deployment

Inception and Elaboration Phase

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Iteration emphasis across the life cycle

Management

Requirements

Design

Implementation

Assessment

Deployment

Construction Phase

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Iteration emphasis across the life cycle

Management

Requirements

Design

Implementation

Assessment

Deployment

Transition Phase

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

Integrasi yang Terus-Menerus

  • Iterative development (design arsitektur pertama-tama dilakukan)

  • Verifikasi aktivitas pada phase design, sehingga dapat dideteksi dan solusi terhadap permasalahan lebih cepat

  • Menghindari “big-bang integration” pada akhir masa pembuatan proyek

MANPRO-M13: MUTU PROYEK SISTEM


Mutu proyek sistem

PERSIAPAN PRESENTASI PROPOSAL PROYEK SISTEM TUGAS MANDIRI 1 PADA PERTEMUAN KE 14

MANPRO-M13: MUTU PROYEK SISTEM


  • Login