1 / 16

MC MEETING PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011 JEANS CARE LIMITED

MC MEETING PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011 JEANS CARE LIMITED. FACTORY IMPROVEMENT AND MANPOWER REDUCTION PLAN -2011. Last 3 months Shipment. Last 3 months Export Qty & Value. FACTORY SALARY COST REDUCTION. 3 months Production, Working Hour, Manpower, Working Day.

rupali
Download Presentation

MC MEETING PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011 JEANS CARE LIMITED

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MC MEETING PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011 JEANS CARE LIMITED

  2. FACTORY IMPROVEMENT AND MANPOWER REDUCTION PLAN -2011

  3. Last 3 months Shipment

  4. Last 3 months Export Qty & Value

  5. FACTORY SALARY COST REDUCTION

  6. 3 months Production, Working Hour, Manpower, Working Day

  7. 3 months Factory Costing

  8. 3 months Factory Costing

  9. Last 3 months Purchase Needle Quantity & Cost

  10. Last 3 months Issue Needle Quantity & Cost

  11. Achievements of last 1 month • Quality Salary cost minimize • Sewing Quality DHU improvement. • Less Re-check. • Excess ship qty month of February. • Less manpower Utilize in every setion. • Less OT & Over night program. • 100% GMTS thread clean from sewing process. • 100% Qc pass output calculation from sewing and finishing. • 100% cutting parts numbering by punch m/c for avoid shading & if we use punch m/c on parts numbering company will be save cost by economically . • Improve floor discipline • All are interested to take won work accountability. • No issue of measurement at right now. how can improve? a) During pp meeting discuss & solved all the issue. b) size set make with right allowance . c) Test cutting gmts check very carefully . d) Time to time cutting parts check with original parrten. e) implementation some quality system in fabric inspection for avoid un-necessary fab shrinkage. 13. After rcvd of wash goods in finishing section my instruction not allow to attach any finishing trims in reject GMTS like as, button / rived adjustable- elastic , buckle, twill tape etc. 14. Small small lot of quality produce implementation & respect all are.

  12. Not achievements and why not improve our quality standard. • Worker migration. • House keeping not good. Need help fm admin and floor production people • Pocketing fabric very poor quality. • More fabric shade variations (like as : shell fabric / pocketing) • Requirement of quality tools not found right time, • Information sharing not timely. • Some cutting issue. • IN efficient supervisor / line chief in sewing and finishing section.

  13. Month of March Quality Objectives • Less Quality after product made. • Less Rejection of product making • Less Re-check in final audit • To bring down cutting rejection , sewing rejection & finishing rejection. • Quality system implementation in area wise.

  14. THANK YOU

More Related