1 / 18

Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund

Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas Market North / North-West Key Operator Contacts “Interconnections, Primary and Secondary Market” Volker Schippers, E.ON GT Anke Alvermann, BEB. Contents.

rumer
Download Presentation

Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation GroupERGEG Regional Gas Market North / North-West Key Operator Contacts“Interconnections, Primary and Secondary Market” Volker Schippers, E.ON GT Anke Alvermann, BEB

  2. Contents • Background • Current Situation • Alternatives • Proposal • Way forward

  3. First N/NW Stakeholder Group Meeting (slide I) EFET perceives that • market structures and limited availability of transport capacity between markets have a significant impact on the traded wholesale markets (hubs) and proposed that • TSOs should obtain or reserve capacity for day ahead capacity auctions • Shippers should be requested to resell unused capacity

  4. First N/NW Stakeholder Group Meeting (slide II) • Auction Process proposed by EFET • until 09:00 Shippers place available capacity in the auction • until 09:30 TSO(s) publish available capacity and its nature (firm / interruptible) • 09:30 to 10:00 Auction • before 10:15 TSO(s) communicates results • Envisaged Start 1 April 2007

  5. Task defined on second N/NW IG • North /North-West operators develop a study on Co-Ordination on Day Ahead Capacity • Interconnection Points • Bunde – Oude Statenzijl (H-gas) • Ellund • Operators work out study until end of December 2006

  6. Contents • Background • Current Situation • Alternatives • Proposal • Way forward

  7. TSOs at the Interconnection Points • Bunde / Oude Statenzijl (H-gas) • BEB • E.ON Gastransport • Gastransportservices • Wingas Transport • Ellund • BEB • Dong Energy Pipeline • E.ON Gastransport • Energinet.dk

  8. Main Current Conditions:Bunde / Oude Statenzijl (H-gas)

  9. Main Current Conditions: Ellund

  10. Contents • Background • Current Situation • Alternatives • Proposal • Way forward

  11. Short Term Capacities Product Features Organisation Allocation of Revenues Allocation of Capacities

  12. Alternative Product Features Product Features • Interconnection Points • Bunde / Oude Statenzijl (H-gas) • Ellund • Entry – Exit Capacity • Separate entry and separate exit capacity • Combined entry-exit capacity • Type • Firm (primary from TSO) • Firm (secondary from shipper) • Interruptible (primary from TSO) • Interruptible (secondary from shipper) • Duration • Daily • Lead time • Day-ahead

  13. Alternative Forms of Organisation Organisation • Who • TSOs • Jointly • Bilaterally • Locationally • Joint Venture • Energy Exchange • Platform • Internet Website

  14. Alternatives of Allocation ofCapacities and Revenues Allocation of Capacities • Allocation of Capacities • Auction • Pro-Rata • FCFS • Allocation of Revenues • Depending on the products and specific national / European rules remaining revenues may be • reimbursed to original capacity holder (shippers or TSO) • shared between shippers and TSOs • Platform operator receives (fixed) handling fee Allocation of Revenues

  15. Contents • Background • Current Situation • Alternatives • Proposal • Way forward

  16. Proposal • Product features • Location: Bunde / Oude Statenzijl (H-gas) and Ellund • Combined entry and exit capacities • Interruptible capacities offered by TSOs • Duration / Lead time: day ahead daily capacity • Organisation • TSOs • Allocation of Capacities • Auction • Allocation of Revenues • TSOs receive the revenues

  17. Contents • Background • Current Situation • Alternatives • Proposal • Way forward

  18. Way Forward • 9 February 2007 • Discussion on North / North-West stakeholder workshop in Bonn, Germany • After the Workshop (in case of agreed-upon solution) • Check of national implementability (national rules / market) • Development of specification and implementation plan • Definition of starting date

More Related