Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site

Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site. Ground Launch Schedule. Total Cost Modifier. Credit to William Ling. Aircraft Timeline. Balloon Timeline. Rocket Design Schedule. Credit to William Ling. Aircraft Design Schedule. Credit to William Ling.

ruggiero
Download Presentation

Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jerald A. BaltaFebruary 21, 2008Propulsion Team / CadCost Modifier – Launch Site AAE 450 Spring 2008

  2. Ground Launch Schedule AAE 450 Spring 2008

  3. Total Cost Modifier Credit to William Ling AAE 450 Spring 2008

  4. Aircraft Timeline AAE 450 Spring 2008

  5. Balloon Timeline AAE 450 Spring 2008

  6. Rocket Design Schedule Credit to William Ling AAE 450 Spring 2008

  7. Aircraft Design Schedule Credit to William Ling AAE 450 Spring 2008

  8. Balloon Design Schedule Credit to William Ling AAE 450 Spring 2008

  9. Design costs for six months • The total salary cost, assuming the entire class size of engineers (forty) at a standard engineering rate for six months according to Space Mission Analysis and Design • $3,000,000 AAE 450 Spring 2008

  10. Balloon Design update Pricing of balloon from Aerostar Update on breakeven height Altitude set at 30000 meters Compares height between sea level and 30000 meters and outputs higher cost AAE 450 Spring 2008

  11. Cost trends from Aerostar AAE 450 Spring 2008

  12. References • Delta II Payload Planners Guide, The Boeing Company, Huntington Beach, CA, 2006 • Falcon 1 Launch Vehicle Payload Users Guide, Space Explorations Technology, Hawthorne, CA, 2007 • Larson, Wiley J., et al. Space Mission Analysis and Design, Microcosm Press, El Segundo, CA, 1992. • Pegasus User’s Guide, Orbital Sciences Corporation, Dulles, VA, 2007 • Perez, Edouard, Ariane 5: User’s Manual, Arianespace, Washington D.C., 2004 • Skladanek, Steve J., “Atlas 21st Century Launch Operations,” 38thAIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit, Indianapolis, IN, 2002. • Smith, Mike, Phone Conversation, Aerostar International, February 15, 2008 AAE 450 Spring 2008