1 / 18

Building a 1” DEM for Australia

Building a 1” DEM for Australia. Water for a Healthy Country. Dr David Lemon Research Stream Leader – Water Informatics September 2008. Introduction to geography of Australia. Growing Urban Demand. Over-allocation to Irrigation. Drying & Warming Climate. Expanding Plantations.

rspillman
Download Presentation

Building a 1” DEM for Australia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building a 1” DEM for Australia Water for a Healthy Country Dr David Lemon Research Stream Leader – Water Informatics September 2008

  2. Introduction to geography of Australia Insert presentation title

  3. Growing Urban Demand Over-allocation to Irrigation Drying & Warming Climate Expanding Plantations Uncapped Groundwater Extraction Bushfire Recovery Impacts Expanding Farm Dams The Environmental Flows Imperative Water scarcity: A deepening problem. 8 Water Scarcity Factors Insert presentation title

  4. Options for a new National DEM • The 9 second (250 m) DEM is the only national bare-earth DEM • Does not meet requirements • ALOS PRISM/PALSAR • 5-10m postings & 3-10m Z (DTED2.5) • Requires large investment in photogrammetry • SPOT HRS • 20m postings 10-15m Z (DTED2) • COTS solution • Requires large investment in data and photogrammetry for DEM • SRTM • DTED2 a significant improvement on DTED1 • Existing Regional DEMs and Elevation data • Not a national coverage Insert presentation title

  5. Options for the New National DEMSRTM • SRTM DTED2 (1sec) will open up the interior of Australia • There is information on landscape structure never seen before • Significant advancement on current 9sec DEM • Work on 3sec SRTM has proven problematic and would require enormous investment in manual editing • SRTM DTED2 has proven to be more suited to automatic artefact and vegetation removal. • Moving from 3 second to 1 second takes us beyond a visually attractive product to one that is usable for serious quantitative purposes • Major investment will still be required in manual editing and data integration • All other options are very expensive • Likely to be made obsolete by new data sources within 5 years STRM DTED2 (1sec) offers the the most consistent and cost-effective platform for the next National DEM 9sec DEM 1sec SRTM DEM Insert presentation title

  6. Effects of different DEM types and resolutions 9 second SRTM 3 second SRTM 1 second Regional 25 m Lidar 5 m Insert presentation title

  7. SRTM and 9 second in the arid zone Insert presentation title

  8. SRTM cleanup Insert presentation title

  9. Processing steps • Fourier transform filtering to remove systematic stripes (sensor artifacts) • Removal of vegetation offsets • Identification of affected areas using vegetation mapping from remote sensing and direct detection from DEM • Measurement of vegetation height offset and construction of vegetation height surface • Removal of height offset in affected areas • 1 second data greatly facilitates this process • Adaptive smoothing to reduce random height variations in flatter areas • Drainage enforcement with ANUDEM using mapped streams • Quality assurance yet to be performed • Manual intervention will be required in some areas Insert presentation title

  10. Fourier filtering for de-striping • This is one of the worst affected areas on all of Australia, but the artefact in a subtler form is widespread • Not yet fully optimised – some stripes remain Insert presentation title

  11. Vegetation detection Insert presentation title

  12. Vegetation offset removal Insert presentation title

  13. Adaptive smoothing Insert presentation title

  14. Drainage enforcement Insert presentation title

  15. SRTM 1 contribution to catchment delineation 150 148 146 144 0 10 20 km Insert presentation title

  16. Key advantages of 1 second data • Cleanup of SRTM data is much easier and much more effective using the 1 second data • 3 second data blurs the edges we need to identify for vegetation removal • Released product ideally based on 1 second, not 3 second • Quantitative analysis demands better than 3 second data • Representing surface shape • Capturing correlations with soil properties • Matching natural and constructed features in the landscape Insert presentation title

  17. Summary • SRTM cleanup process is operational • Room for improvement, development is continuing • 1 second data provides much better basis for veg removal • QA and correction will be required before release • Currently scoping effort required • Cleaned SRTM without drainage enforcement can provide a useful DEM for non-hydrological purposes • Vegetation height information as a byproduct • With appropriate stream data SRTM can construct the geospatial fabric for water resource management, in combination with other DEMs as necessary • Release of SRTM 1 second data would enable a host of applications that are not possible with pre-SRTM data and have limited value using 3 second SRTM Insert presentation title

  18. CSIRO Land and Water Dr David Lemon Research Stream Leader – Water Informatics Phone: +61 2 6246 5724 Email:David.Lemon@csiro.au Web: www.csiro.au/clw Thank you Contact UsPhone: 1300 363 400 or +61 3 9545 2176Email: Enquiries@csiro.au Web: www.csiro.au

More Related