An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GCT Progress (19-Sep:11-Oct 06) • Brief status of the GCT hardware • Progress since the last trigger meeting (19/9/06) CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 1

  2. Source Card Status I • 8 Source Cards have been delivered to Imperial and are currently under test. • John and Andrew will be here during the last week of October to: (a) Setup for the Leaf-Source Integration (b) Install the RCT readout. • USB readout software ready for reading RCT (old news). • Readout PC inherited from the old project. 10 at hand CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 2

  3. Source Card Status II • Have enough parts to build 52 source Cards. Requested quotes for additional source Card parts (enough for 12 Source Cards more). • Electron and Jet triggers require 64 Source cards. • If the muon data are also included we need 72 Source Cards. • 72 Source Cards will be build by Dec. 06; • Need to order the RCT to GCT cables soon (108 of them). • One Source-to-Leaf link was installed. The Links will be 12 m long (not 20m as originally thought). • All optical links will be ordered very soon. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 3

  4. Leaf Card Testing Oct. 06 • Past tests: • JTAG  • USB  • Clocks  • TTC  • VME  • Over the past few weeks Matt has been testing the Multi Gigabit Transceivers (MGTs). The MGTs receive serial data from the 12 channel optical transmitters. • The test is done using the local on-board loop back of the VIRTEX-II Pro. • It tests how well the MGTs are powered and if there is any problem with the power these tests are bound to fail. • Each VIRTEX-II Pro has 16 MGTs and each Leaf has 32. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 4

  5. Leaf Card continued… • For these tests data patterns are looped through the MGTs and a CRC is computed each time to test the data integrity. If the CRCs do not match the program stops and you know that an error has occurred. • All 16 MGTs from one Virtex-II Pro have now been tested and work. Matt will continue testing the rest. • John and Andrew will bring then the Source Card to do the integration tests. They will of course start with one fibre and they will escalate up to 32 channels. • We plan to build 16 Leaf Cards all together (8 are needed for all electron and jet triggers) • An order for 16 Virtex-II Pro parts is about to go out (32 are needed all together) CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 5

  6. Concentrator + Wheel Card • The Concentrator Card should be delivered to CERN within a couple of days. • The GT-Link card is at CERN layout and should go to production at the end of October. • The Wheel Card Layout is finished and we decided to wait for the Leaf Concentrator Integration first. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 6

  7. The Concentrator Card I • Arrived yesterday afternoon … CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 7

  8. The Concentrator + Leaf Cards • One Leaf mounted on it … CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 8

  9. RCT to GCT Optical Links • Understanding of the optical link data transmission and margins was raised during the May 06 GCT ESR • The problem raised is shown to the right: • One has to vary the power of the transmitter using an attenuator and measure BER. However the required attenuator was missing and was delivered later. • Andrew Rose performed tests in July and October 06 and the following is a summary of his work (assisted by the CMS Opto-Electr. Group. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 9

  10. Optical Links Tests: July 06 Copper Output OK Optical Output (scope) • The left plot is an eye diagram taken using a scope driven by a Source Card optical driver. In blue are the prohibited by spec. regions. • The right plot is the ‘copper’ output after it goes through a ‘Leaf Card’ receiver. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 10

  11. Attenuator MPO terminated fibres Source Card Patch panel SFP LC terminated fibres SFP Snap-12 evaluation board SFP evaluation board Copper link October 06 Optical Link Tests October 06 Setup • He used the attenuator and the Snap-12 + SFP evaluation cards connected to the receiver on the Source Card (emulating a Leaf to measure BER for different settings of the attenuator and different SFPS • Showed some batch-batch variation in snap-12 receivers. • For worse batch, errors started to appeared with attenuation of 16.75dB and ‘edge’ appeared at 17.3dB. • Channel to channel variation was limited (std. dev ~ 0.2dB in point where BER went above ~10-9) CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 11

  12. Stated RX Operating limit Stated TX Operating limit Available for connectors Very Preliminary: Andrew Perhaps we are safe ? Need to do more ? CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 12

  13. Other Link Issues • The Maximum Length between the Source Cards and the Patch Panel (installed directly above the GCT crate) is 12 m. • The length of the TTC Fibres from the TTC crate to the Source Card crates have also been measured to be 15 m. • We are in the process of ordering them. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 13

  14. Online and Test Software • The Concentrator Card Software: Low-Level software and the user interface, written in python, have been debugged and fully tested using a TTCvi emulating the concentrator VME interface. • Rob Frazer is now integrating this with the latest version of the trigger supervisor. • Rob is coming to CERN on the 23.10.06 and he will be at CERN for 3 days a week from then on till the concentrator is in working order… CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 14

  15. Emulator Software • GCT emulator is ready to be released for public use in CMSSW version 1_2_0 next week. • It has been tested as well as we could considering that our input data seems faulty and has been like this for sometime now. • Magnus is re-writing his jet finder code for Virtex-II Pro and we need to have some Monte Carlo feedback on several issues. I had hoped that this would be possible before we spend 50 K$ for FPGAs CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 15

  16. Monitoring Software • Monitoring package is ready for public use, and will go in 1_2_0 as well (tested with patterns). • However for the moment several things are incorrect in the input data stream: single pions (-4.8 < eta < -3) with 1_1_0_pre2 b-jets with 0_9_2 b-jets with 1_1_0_pre2 Junk Junk No HF Jets We cannot go on like this !! CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 16

  17. Summary and Outlook Summary: • Ready to proceed with the Source Leaf Integration. • We now have enough Source Cards (10) for GCT integration tests and RCT. • Concentrator Card tests will start as soon as the card is here.. Goals for Fall 2006: • Watch closely the progress on the Leaf and make sure that the Leaf Source Integration occurs in October. (this is now for sure) • Test the first Concentrator prototype which is arriving on time • Watch closely the GT card production which will enable the GT-RCT integration in December 06. • Produce and install the Source Card system by end of January 07. CMS September Trigger Meeting 12/10/06 CERN C. Foudas - Imperial 17