THEMIS
Download
1 / 8

THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS - PowerPoint PPT Presentation


  • 97 Views
  • Uploaded on

THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS FM1 Instrument Pre-Ship Review University of California, Berkeley September 21, 2005. Conference Rooms. Main Conference Room.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS' - ross


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  • THEMIS

  • TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS

  • RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START

  • THEMIS

  • FM1 Instrument Pre-Ship Review

  • University of California, Berkeley

  • September 21, 2005


Conference rooms
Conference Rooms

Main Conference Room

  • Coffee, and food at Silver Addition Main Entrance (outside)

  • Splinter room in Silver Annex Conference

  • Parking Passes, see Daniele

  • Other issues, see:Vassilis Angelopoulos or Peter Harvey

Silver Addition

Samuel Silver Space Sciences Laboratory

Silver Annex

For maps, etc. go to http://www.ssl.berkeley.edu/


Agenda
Agenda

  • AGENDA 



Mission schedule
Mission Schedule

THEMIS Bus, Instrument & Mission I&T Schedule

PROJECT MGR. : PETER HARVEY

STATUS AS OF: 9/01/05

MISSION MGR. : FRANK SNOW

CY 2004

CY 2006

CY 2005

Probe Delivery

MILESTONES

M

J

M

J

A

N

D

J

F

M

A

J

A

S

O

N

D

J

F

M

A

J

S

O

CRR

2/04

4/22

CR @ HQ

P1 PER

12/12-13

P2-P5 PER

4/20

MAJOR REVIEWS

P1 Test Review

FGM/SCM CDR

4/06-08

PSR

6/20-21

3/01-15

4/19-20

INSTRUMENT CDR

6/14-18

MISSION CDR

BAU EDU#2

FLT 1 BAU

P1 INTEGRATION & TEST

AEB

MECH H/W

IRU

1

11/17

LEGEND

9/20

PROBE SUBSYSTEM HARDWARE

AVIONICS B/U

Swap out

-- Intermediate Slack

SHIP to UCB

BUS MECH & AVIONICS BUILD UP (Swales)

MECH BUILDUP

5/02

6/09

C/O

PROBE I&T

-- Project Reserve

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

INSTRU COMPL

SHIP to JPL

P1 Test Review

10/12

9/21

12/15

ENVIRONMENTALS

-- Critical Path H/W

ENVIRONMENTAL TEST & CLOSEOUTS (JPL)

BAU EDU#1

FLT 2 BAU

3/01

3/15

AEB

IRU

-- Instrument Slack

MECH H/W

P2 INTEGRATION & TEST

2

12/22

PROBE SUBSYSTEM HARDWARE

Swap out

AVIONICS B/U

SHIP to UCB

MECH BUILDUP

BUS MECH & AVIONICS BUILD UP (Swales)

2/08

12/05

11/13

1/04

7/18

10/20

9/14

PROBE I&T & C/O

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

INSTRU COMPL

FM1 Instruments

2/09

9/28

3/14

MECH H/W

AEB

IRU

FLT 3 BAU

P3 INTEGRATION & TEST

3

1/09

PROBE SUBSYSTEM HARDWARE

AVIONICS B/U

SHIP to UCB

MECH BUILDUP

BUS MECH & AVIONICS BUILD UP (Swales)

9/09

1/10

2/13

10/17

PROBE I&T & C/O

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

INSTRU COMPL

9/28

2/14

3/28

MECH H/W

AEB & IRU

FLT 4 BAU

P4 INTEGRATION & TEST

4

1/25

PROBE SUBSYSTEM HARDWARE

AVIONICS B/U

SHIP to UCB

BUS MECH & AVIONICS BUILD UP (Swales)

MECH BUILDUP

9/23

1/26

2/22

11/03

PROBE I&T & C/O

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

INSTRU COMPL

2/23

11/01

4/07

FLT 5 BAU

MECH H/W

AEB & IRU

P5 INTEGRATION & TEST

5

2/10

PROBE SUBSYSTEM HARDWARE

AVIONICS B/U

SHIP to UCB

BUS MECH & AVIONICS BUILD UP (Swales)

MECH BUILDUP

10/12

2/13

3/09

11/23

PROBE I&T & C/O

BUS/INSTRU MECH & ELEC I&T & C/O (UCB)

INSTRU COMPL

3/10

11/01

4/19

6

P2- P5 SHIP TO JPL

SHIP to JPL

4/25

PROBE VIB

7

PCA INTEGR

5/19

SETUP / PROBE VIB / PCA INTEGR. (JPL)

5/16

PCA VIB/ACOUSTICS

PROBE THERMAL

6/13

8

PCA VIB / ACOUSTICS / THERMAL (JPL)

5/31

9

MAG / SPIN BAL./ P1-5 PACK

6/21

MAG & MASS PROP (JPL) / SHIP

MISSION CONTINGENCY

IIRT CONTINGENCY

8/10

10

MISSION RESERVE

6/22

10 DAYS

26 DAYS

10/19

ASTROTECH

11

LAUNCH PROCESSING/LAUNCH

8/11


Rfa status
RFA Status

RFAs In Work


Rfa status1
RFA Status

Complete w/o Concurrence


Rfa status2
RFA Status

Complete w/o Concurrence


ad