Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~

Loading in 2 Seconds...

play fullscreen
1 / 32

Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~ - PowerPoint PPT Presentation


  • 106 Views
  • Uploaded on

Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~. Prof. Yuan-Shyi Peter Chiu Feb. 2012. § . Inventory Management for Finite Production Rate. • Inventory Levels for Finite Production Rate Model. Slope=P- λ. Slope= - λ. P : production rate (per unit time)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~' - rose-anderson


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Material Management

Class Note #3-B

~ Multiple product EPQ analysis ~

Prof. Yuan-Shyi Peter Chiu

Feb. 2012

slide2

§ . Inventory Management for Finite Production Rate

• Inventory Levels for Finite Production

Rate Model

Slope=P- λ

Slope= - λ

slide3

P : production rate (per unit time)

λ: demand rate (per unit time)

P >λ

slide5

~ EPQ (Finite Production Rate ) Models

for Production Planning ~

◆ Producing n products on a single machine (or line)

Demand rate for product j

Production rate for product j

Holding cost per unit per unit time for product j

Cost of setting up the production facility to produce product j

◆Goals:(1) To determine the optimal procedure for producing

n products on the machine to minimize the cost

of holding & setups.

(2) To guarantee that no stock-outs occur during

the production cycle.

slide6

~ Multiple items production planning ~

◆Assumption (required)

………... [Eq.2]

◇ To ensure that the facility has sufficient capacity to

satisfy the demand for all products.

slide7

~ Multiple items production planning ~

◆Rotation cycle policy assumption :

means that in each cycle there is exactly one setup for each product, and products are produced in the same sequence in each production cycle .

◇ Recall “the finite production rate “ solution

H

where

T

slide8

◆Let T be the cycle time ( new, for the rotation cycle policy)

During time T , we assume that exactly one lot of each

product is produced.

◇In order that the lot for product j be large enough to

meet the demand occurring during time T , it follows

that the lot size should be

(e.g. if T=0.5 year , =12,000

then =6,000)

◇The average annual cost ( of setup & holding costs only )

………... [Eq.3]

slide9

◇ The average annual cost for all products

◇The avg. annual costfor n productsin terms of the cycle time T

………... [Eq.4]

(check G”(T)>0

for minimal)

◇ To find T, minimize G(T) ;

slide10

where

………... [Eq.5]

slide11

~ Multiple items production planning ~

◆ If setup times are a factor, we must check that if there

is enough time each cycle to account for both setup

times and production time of the n products.

Let be the setup time for product j

………... [Eq.6]

4

fits into idle time

2

1

3

0

T

1 year

Idle time

slide12

(or )

then [Eq.6] become

( Let )

◆The optimal solution is to choose the cycle time T

T = max { T* , } if considering

………... [Eq.7]

slide13

Example 4.7

Bali produces several styles of men’s and women’s shoes at a single facility near Bergamo, Italy. The leather for both the uppers and the soles of the shoes is cut on a single machine, This Bergamo plant is responsible for seven styles and several colors in each style. (The colors are not considered different products for our purposes, because no setup is required when switching colors.)

Bali would like to schedule cutting for the shoes using a rotation policy that meets all demand and minimizes setup and holding costs. Setup costs are proportional to setup times. The firm estimates that setup costs amount to an average of $110 per hour, based on the cost of worker time and the cost of forced machine idle time during setups. Holding costs are based on a 22% annual interest charge. The relevant data for this problem appear in Table 4-1.

slide15

◆Example 4.7

◆ Assuming 250 working days a year

(0.1529 year ) * 250 = 38.2 days

slide16

◆Example 4.7

Original – by EPQ single item Not feasible

31.9

34.3

35

35.6

43.4

49.1

50

3.4

6.5

3.1

4.5

4.0

2.8

1.8

in SPT

7

6

5

4

?

3

2

2

1

72.0

0

10

20

30

40

50

60

70

80

24.3

31.9

44.9

9.9

17.5

60.9

70.6

74.3

48.6

3.4

13

21.5

26.1

37.7

slide17

◆Example 4.7

◆ 1 year = 250 days

Original

by Rotation cycle policy

slide18

◆Example 4.7

Original

31.9

34.3

35

35.6

43.4

49.1

50

3.4

6.5

3.1

4.5

4.0

2.8

1.8

in SPT

7

6

5

4

3

2

1

0

10

20

30

40

50

60

70

80

24.3

31.9

44.9

9.9

17.5

60.9

74.3

48.6

3.4

13

21.5

26.1

37.7

slide19

◆Example 4.7

by Rotation cycle policy

in SPT

# 4

# 7

# 5

# 6

# 3

# 2

# 1

0

5

10

15

20

25

30

40

50

60

22.9

47

50.6

61.1

38.2

8.8

12.4

43

49.2

57.8

4.8

11

19.6

26.5

T* = 38.2

slide20

If including setup time sj :

( Let )

◆The optimal solution is to choose the cycle time T

T = max { T* , } if considering

………... [Eq.7]

T = max { 0.1529 , 0.03995 }= 0.1529

slide21

Class Note# 3b

§.I.4.9: Home Work Problems

Chapter 4 : ( # 29, 30) pp.219-220

(a) using Rotation Cycle

( # 45 ) pp.227

Preparation Time : 15 ~ 20 minutes

Discussion : 10 ~ 15 minutes

slide22

§.I.eg.4.7.1: Class Exercise

“IF there are only 2 products”

Holding costs are based on a 22% annual interest charge

Preparation Time : 15 ~ 20 minutes

Discussion : 10 ~ 15 minutes

slide23

◆Example “IF there are only 2 products”

1 year = 250 days

* Data being modified

Original

by Rotation cycle policy

slide24

◆Example “IF there are only 2 products”

  • By rotation cycle policy T*
  • Costs - when using T*

= (1570+2959) + (2258+871)

= (4529) + (3129) = $7,658

slide25

◆To Think about - when producing 2 products

Item “WL” has T1 = 31.9 days

Item “WS” has T2 = 70.6 days

Why using R-C-P ?

To allow producing 1 run

per item per period ?

slide26

Class Note# 3b

§.I.eg.4.7.2.A: Class Exercise

From eg.4.7.1

If we producing 2 runs of item “WL” and 1 run of item “WS” in a period of 70.6 days (or 0.2824 years)

(a) What will the annual costs be?

(b) Draw a chart for production schedule.

Preparation Time : 15 ~ 20 minutes

Discussion : 10 ~ 15 minutes

slide27

Solution to eg.4.7.2.A :

When producing 2 runs of item “WL” and 1 run of item “WS” in a period of 70.6 days (or 0.2824 years)

(a)

∴ T1 = 0.2824 / 2 = 0.1412 years = 35.3 days

∴ Q1 = (λ1) ( T1) = (6600) (0.1412) ≒ 932

∴ T11 = Q1 / P1 = 932 / 62,600 ≒ 0.01488 years ≒ 3.72 days[ up-time]

= (1947.42) + (2385.92) = $4,333

= $2,805

slide28

Solution to eg.4.7.2.A :

= $4,333 + $2,805 = $7,138

Comparing to R-C-P: $7658

There are ($7658 - $7138) / $7658 = 6.8 % cost saved.

slide29

Solution to eg.4.7.2.A :

(b)

#WL-2

#WL-1

# WS

0

6.31

70.6

74.32

35.3

3.72

39.02

T* = 70.6 days

slide30

Class Note# 3b

§.I.eg.4.7.2.B:Class Exercise

From eg.4.7.1

If we producing 2 runs of item “WL” and 1 run of item “WS” in a period of 63.8 days (or 2*0.1276 = 0.2552 years)

(a) What will the annual costs be?

(b) Draw a chart for production schedule.

Preparation Time : 15 ~ 20 minutes

Discussion : 10 ~ 15 minutes

◆G-s-32

slide31

Class Note# 3b

§.I.eg.4.7.2.C: Class Exercise

From eg.4.7.1

If we producing 2 runs of item “WL” and 1 run of item “WS” in a period of 66.4 days (or 0.2656 years)– i.e. the optimal length for period

What will the annual costs be?