1 / 24

Ephesians 2:21-22 ESV / 31

Ephesians 2:21-22 ESV / 31. “In whom the whole structure, being joined together, grows into a holy temple in the Lord. In him you also are being built together into a dwelling place for God by the Spirit.”. Capacity Campaign Report to Church Leadership August 24, 2014. Agenda Prayer Building

roger
Download Presentation

Ephesians 2:21-22 ESV / 31

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ephesians 2:21-22 ESV / 31 “In whom the whole structure, being joined together, grows into a holy temple in the Lord. In him you also are being built together into a dwelling place for God by the Spirit.”

  2. Capacity CampaignReport to Church LeadershipAugust 24, 2014 Agenda Prayer Building Staffing Mission Financial Data Q&A Next Steps

  3. Building Roof and related Repairs New Restrooms and Showers Parking Maintenance Reserve

  4. Roof and related Repairs • Need: • Sanctuary roof needs to be re-roofed (re-shingled) and will require some underlayment replacement • Wood soffit has some areas of rot • Response: • Replace roof shingle and underlayment as needed on Sanctuary • Repair/replace rotted wood at eave overhang

  5. New Restrooms and Showers • Need: • Additional and easily accessible restrooms • Handicap accessible restrooms on the main floor (Sanctuary/Narthex) level • Showers • Response: • New handicap accessible restrooms are proposed for the main floor near the library. This will include a minimum of (4) new toilets for women and (2) new toilets for men • Showers are proposed to be added. Location to be determined.

  6. Parking • Need: • Additional parking • City zoning regulations do not allow for reconfiguration or changes of the existing parking lot (as it is currently non-compliant) • City zoning requires that any new parking be located in the Southeast corner of the property behind the building • Response: • The Building Task Group along with Samsel Architects have investigated the options of adding new parking. • The limitations by City zoning leave GCPC with an area for 26 parking spaces maximum • $200,000 to provide as many parking spaces as affordable

  7. Maintenance Reserve • Need: • The building has a number of deferred maintenance issues that should be addressed • Due to the age of the building and its systems (HVAC, electrical, plumbing) problems which need to be repaired or replaced • Response: • Samsel Architects has recommended a minimum annual budget allotment of $2.00 per square foot for maintenance and improvements. The facility is approximately 32,000 square feet equal to $64,000 per year.

  8. Personnel • Need: • GCPC’s current Program Staff to fulfill the GCPC Ministry Plan is inadequate, particularly in the areas of Youth and Young Adults and our growing mission work. • Response: • Add 1 Fulltime Associate Pastor (by adding funds for additional ½ FTE) • This position effectively replaces all the part-time youth and young adult staff budgeted during 2014 (equivalent to one-half of a full-time position, or $30,000) • Approximately $35,000 additional funds annually • Will assist current ordained staff in meeting the demands for pastoral care, community engagement and daily church life • Will provide additional capacity to respond to programs and activities waiting in the wings based on the Ministry Plan • Estimated to be on board on/about June 2015

  9. Personnel • Need: • GCPC utilizes contract handyman services for routine maintenance Staff and volunteers are used for building set-ups. Staff expends 5 to 10 hours a week preparing rooms for Sunday activities • Response: • Add 1 Part-Time Sexton (20 hrs/wk) • Non-benefit position scheduled to work 20 hrs/wk; Flexible work days • Salary: $20,000 per year • Estimated to be on board on/about January 1, 2015. • Key duties: • Weekly job list and large room set ups (currently done by contracted custodian) • Sunday building opening and facility issues that arise • Other duties now being done by Heather, Mark and Kristy

  10. Capacity: to serve God while serving others Serve Council presents: challenges and opportunities for the future with Grace Covenant.

  11. Hospitality: within our walls, in our community, and Globally Need: • Make our Hospitality Space more useful and inviting • Improve set up/flow from hospitality events to church events • Continue support and important work that GCPC does within and outside our physical space Response: • Bathroom and shower facilities • Parking • Staff- sexton for setup/ take down; pastoral staff for support of programming, and theological responses… • TITHE of $ raised by campaign-for Local and Global mission

  12. GCPC garden

  13. Locally at GCPC Within the church building: Our building is used most days of every week for community outreach, and several times a year for special opportunities of service: • AA meetings • Youth gatherings, including out of town youth needing overnight accommodations, etc. • RITI(Room in the INN-for homeless women) • 15 different groups meet regularly representing over 400 persons • Use has increased 3X’s over past 7 years!

  14. Caring for Creation/Earth Day

  15. Outside our walls; but within our neighborhood/community • GCPC works with programs to end Homelessness • To feed local families • Support children • So much MORE-Serve Fair after worship • Opportunities- tithe from any campaign; staff/pastoral support, meeting space for planning events,

  16. CROP WALK

  17. After school programs, Guatemala

  18. Guatemala

  19. Globally • Our staff, members and $-support • Haiti-sustainable gardening, clean water, health services and more • Partnership with Jerusalem Church in Guatemala, and the children’s scholarship program there-building a church in Coatepeque. • Malawi- children’s hospital/clinic- support for Dr Nagy Opportunity: Tithe support

  20. Phase I Capital Campaign Estimated Total $1,260,000 • Roof on Sanctuary $370,000 • Restrooms and Showers $350,000 • Parking (no more than) $200,000 • Maintenance Reserve $ 64,000 • Staffing: (seed $$ for 2 years) • Associate Pastor $ 70,000 • Sexton $ 28,000 • Mission (1/2 Local, 1/2 Global) $126,000 • Consultant/Fundraising $ 50,000

  21. Timeline/Next steps • August 31 Begin Information/dialogue sessions in various venues with groups and classes, etc. • September 6 Congregational retreat • September 7 Information/dialogue sessions in sanctuary after 10:30 worship • September 14 Information/dialogue sessions in sanctuary after 10:30 worship with Architects present • September 21 Information/dialogue sessions in sanctuary after 10:30 worship • September 28 Final packet completed and sent out to all members (testimonials, details, costs) Information/dialogue sessions in sanctuary after 10:30 worship • October 12 11:30 a.m. - Congregational meeting to vote on campaign

  22. Q & A • What additional information do you need? • Here’s how you can help: • Provide dates/times for O Team rep to attend your group, council, class, etc.

More Related