an adaptive multi objective scheduling selection framework for continuous query processing
Download
Skip this Video
Download Presentation
An Adaptive Multi-Objective Scheduling Selection Framework For Continuous Query Processing

Loading in 2 Seconds...

play fullscreen
1 / 28

An Adaptive Multi-Objective Scheduling Selection Framework For Continuous Query Processing - PowerPoint PPT Presentation


  • 82 Views
  • Uploaded on

An Adaptive Multi-Objective Scheduling Selection Framework For Continuous Query Processing. A Presentation @ IDEAS, Montreal, Canada, July 27, 2005. Timothy M. Sutherland Bradford Pielech Yali Zhu Luping Ding and Elke Rundensteiner Worcester Polytechnic Institute Worcester, MA, USA.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' An Adaptive Multi-Objective Scheduling Selection Framework For Continuous Query Processing' - rod


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
an adaptive multi objective scheduling selection framework for continuous query processing

An Adaptive Multi-Objective Scheduling Selection Framework For Continuous Query Processing

A Presentation @ IDEAS, Montreal, Canada, July 27, 2005

Timothy M. Sutherland

Bradford Pielech

Yali Zhu

Luping Ding

and Elke Rundensteiner

Worcester Polytechnic Institute

Worcester, MA, USA

continuous query cq processing
Continuous Query (CQ) Processing

Register

Continuous

Queries

May have different QoS Requirements.

Streaming Data

Streaming Result

Stream Query

Engine

May have time-varying rates and data distribution.

Available resources for executing each operator may vary over time.

Run-time adaptations are required for stream query engine.

runtime adaptation techniques
Runtime Adaptation Techniques
  • Operator Scheduling
  • Query Optimization
  • Distribution
  • Load Shedding
  • Others
operator scheduling for cq
Operator Scheduling for CQ
  • Operator Scheduling
    • Determines the order to execute operators
    • Allocates resources to query operators
  • Existing Scheduling Algorithms
    • Round Robin (RR)
    • First In First Out (FIFO)
    • Most Tuples In Queue (MTIQ)
    • Chain [BBM03]
    • Others

4

scheduler

3

1, 2, 3, 4

1

2

stream B

stream A

properties of existing scheduling algorithms
Properties of Existing Scheduling Algorithms
  • Uni-Objective
    • Designed for a single performance objective
      • Increase throughput
      • Reduce memory
      • Reduce tuple delay
  • Fixed Objective
    • Cannot change objective during query run
  • May be insufficient for CQ processing
performance requirements in cq
Performance Requirements in CQ
  • May be multi-objective
    • Example
      • Run time-critical queries on memory-limited machine
      • Two performance goals: less result delay and less memory
  • May vary over time
    • Example
      • System resource availability may change during query run
      • Under light workload: faster throughput
      • Under heavy workload: less memory
  • Existing scheduling algorithms
    • Not designed for multiple changing objectives
    • As a result, each has its strengths and weaknesses
scheduling example fifo

0

0.09

0.09

0

0

0

0.09

0.18

3

3

3

3

3

3

3

0

0.09

0

0

0

0

0.09

0

0

3

1.25

3.25

1

2

4

2

2

2

2

2

2

2

0

0

0

0

0

0.9

0.9

0

1

1

1

1

1

1

1

2

1

2

1

0

3

1

2

Scheduling Example: FIFO

FIFO

Start at leaf and process the

newest tuple until completion.

End User

σ = 1

T = 0.75

3

Time:

σ = .1

T = 0.25

2

  • FIFO’s queue size grows quickly.
  • FIFO has fast first outputs

σ = 0.9

T = 1

1

Stream

slide8

0

0

0

0

0

0

0

0

0

0

0

3

3

3

3

3

3

3

3

3

3

0.2

0

0.1

0

0.1

0.2

0.3

0.4

0.3

0

0

4.5

4.75

2

1

5.75

3.25

0

6

2.25

3.5

2

2

2

2

2

2

2

2

2

2

1.5

0.6

0.5

0.7

1.6

1.7

0

0

0.8

1.8

0.9

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

2

1

1

1

Scheduling Example: MTIQ

MTIQ

Schedule the operator with the largest input queue.

End User

σ = 1

T = 0.75

3

Time:

σ = .1

T = 0.25

2

  • MTIQ’s queue size grows at a slower rate
  • Tuples remain queued for longer time

σ = 0.9

T = 1

1

Stream

summary of problem
Summary of Problem
  • What does CQ need:
    • Runtime Adaptation
    • Multiple prioritized optimization goals
    • Dynamically changing optimization goals
  • Our solution -- AMoS
    • Adaptive Multi-Objective Scheduling Selection Framework
outline
Outline
  • Introduction and Motivation
  • The AMoS Framework
  • Experimental Evaluation
  • Conclusion
general idea of amos framework
General Idea of AMoS Framework
  • Meta-scheduler
    • User specify multiple performance objectives
    • Rank scheduling algorithms based on performances
    • Dynamically select the current best algorithm
  • Design logic
    • Simple, low overhead and effective

Performance

Requirements

Algorithm

Evaluator

Statistics

Scheduling

Algorithm Library

Selecting

Strategy

Algorithm

Selector

Decision

Request

Scheduler

Decision

specifying performance objectives
Specifying Performance Objectives
  • Metric: Any statistic calculated by the system.
  • Quantifier: Maximize or Minimize
  • Weight: The relative weight / importance of this metric
    • The sum of all weights is exactly 1.
adapting scheduler
Adapting Scheduler
  • Step 1: Scoring Statistics Periodically
  • Step 2: Scoring Scheduling Algorithms
  • Step 3: Selecting Scheduling Algorithm
step 1 scoring statistics
Step 1: Scoring Statistics

Performance Objectives

Stats Score Matrix

  • Update stats scores of the current scheduling algorithm Acurrent
    • Zi_new-- score of stat i for Acurrent
    • μiH, maxiH, miniH -- mean, max and min history value of stat i.
    • μiC -- most recent collected stat i.
    • decay -- decay factor in (0, 0.5). Exponentially decay out-of-date data.
  • Zi_new ∈(-1, 1).
step 2 scoring scheduling algorithms
Step 2: Scoring Scheduling Algorithms

Stats Score Matrix

Performance Objectives

  • Update score of scheduling algorithm A.
    • ScoreA-- score for A.
    • zi – score of stat i for A.
    • qi – -1 for minimize, 1 for maximize
    • wi – Weight in table of objectives.
    • Add 1 to shift from [-1, 1] to [0, 2].
  • ScoreA ∈(0, 2).
issues in scheduler selection process
Issues In Scheduler Selection Process
  • The framework need to learn each algorithm
    • Solution: All algorithms are initially run for once
  • Algorithm did poorly earlier may be good now
    • Solution: Periodically explore other algorithms
    • Reason for adopting the Roulette Wheel Strategy
step 3 selecting next algorithm
Step 3: Selecting Next Algorithm

Roulette Wheel [MIT99]

  • Chooses next algorithm with a probability equivalent to its score
  • Favors the better scoring algorithms, but will still pick others.
  • Well performed ones have better chances
  • Others also have chances to be explored
  • Lightweight so overhead is very low
  • Proven to be effective in experimental study
overall flow of the adapting process
Overall Flow of the Adapting Process

Input: performance objectives &

candidate scheduling algorithms

Initially run all algorithms once

Periodically Scoring statistics

change

requested?

N

Repeat until

query is done

Y

Rank candidate algorithms

Select next algorithm to run

summary of the amos framework
Summary of the AMoS Framework
  • Light-weight
    • Use runtime statistics collected by the system
    • Ranking formula are simple yet effective
  • Self learning
    • No apriori information needed
    • Learn behaviors of scheduling algorithms on the fly
  • Easily extendable
    • Add more scheduling algorithms
    • Add more performance objectives
    • Add more selecting strategies
outline1
Outline
  • Introduction and Motivation
  • The AMoS Framework
  • Experimental Evaluation
  • Conclusion
experimental setup
Experimental Setup
  • Evaluated in CAPE system [cape04]
    • A prototype continuous query system
  • Query plans
    • Consists of join and select operators
  • Input streams
    • Simulated with Poisson arrival pattern
  • Performance objectives
    • Different number of objectives
    • Different weight of objectives
two performance objectives
Two Performance Objectives

50% focus on output rate, 50% focus on tuple delay

two performance objectives cont
Two Performance Objectives (cont.)

70% focus on tuple delay, 30% focus on output rate

30% focus on tuple delay, 70% focus on output rate

three performance objectives
Three Performance Objectives

Equal focus (33%) on output rate, memory and tuple delay

conclusions
Conclusions
  • Identified the lack of support for multi-objective adaptation
    • Existing approaches only focus on single objective
    • Cannot change objective during query run
  • Proposed a novel scheduling framework:
    • Allows applications to control performance objectives
    • Alters scheduling algorithm based on run-time performances
    • Independent of scheduling algorithms or performance objectives
  • AMoS strategy shows very promising experimental results.
    • Developed and evaluated in the CAPE system
    • W/ single objective, performs as well as the best algorithm
    • W/ multiple objectives, overall better than any algorithm
thank you