An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status and Planning For TRAP/MCM production OASE GTU Volker Lindenstruth Chair of Computer Science Kirchhoff Institute for PhysicsUniversity Heidelberg, Germany Phone: +49 6221 54 9800 Fax: +49 6221 54 9809 Email: ti@kip.uni-heidelberg.de WWW: www.ti.uni-hd.de

  2. MCM and ROB Production Status for the ALICE TRD Thomas Blank Forschungszentrum Karlsruhe Institut für Prozessdatenverarbeitung und Elektronik (IPE) Romania, 23.09.2005

  3. Step 1 PCB Design & material • PCB material: • Warpage was significantly reduced !! • -> modified curing procedure of Glob Top • Material for the production of 6400 MCM’s ordered Step 7 MCM Tester • General information • The tester has a contact issuse actions taken: -> solution: increase depth, with which the needles are driven into balls -> clean MCMs before testing (flux residues) -> checked needle position with endoscope (ok!) • Probably a Chip has to be contacted twice

  4. MCM Production schedule • General information • 340 MCM’s needed for ROB assembly. -> 170 will be delivered on Wednesday 28.09.05, • -> 170 will be delivered on Friday 29.09.05 • Afterwards the production will be ongoing: • Target: minimum 4000 MCMs until end of 2005

  5. Action Items • OASE • Clock source  quartz oscillator (adds latency) • Proof with V2 MGT RX • Finalise PCB and produce 100 units ASAP • Radiation tests (?) • GTU • Finalize layout (October) • Produce 1 ... 2 PCBs and get them running (at least with a few MGTs • Integration with detector in Q1/06 • Wafer Testing • Positioning problems solved  Laser ID OK • Contact problems urgent • Verify contact quality manually for next tests • Clean needle card (again) • Test second needle card • MCM production

  6. Action Items • Launch DCS board production • Full TPC • 60% TRD now? • Wafer production • 100 TRAP3A wafers in January 2006 for 60% TRD completionlocked in at UMC (they are at 100% allocation again) – confirmed by IMEC – final pricing confirmed • Remaining wafers depending on yield in January 2007